Topline Builders Corp
- Based in
- Daly City
- On San Francisco permits
- Feb 2006 to Oct 2022
- Last 24 months
- 0 permits filed
145 permits since 2000: 119 completed, 19 never finaled, 7 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2019 | Completed final sign-off May 2020 | 1453 26th Av | 1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stairDetails
1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stair | $80,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2019 | 1767 31st Av | 1/f: add 2 bedrooms, 2 baths, & media room with wetbar. 2/f: relocate kitchen, rmeodel bath & add 1 bath & laundry. new deck at rear with sliding doors, window, & siding. replace front windows in-kind with alumn-clad wood windows.Details
1/f: add 2 bedrooms, 2 baths, & media room with wetbar. 2/f: relocate kitchen, rmeodel bath & add 1 bath & laundry. new deck at rear with sliding doors, window, & siding. replace front windows in-kind with alumn-clad wood windows. | $120,000 |
| Aug 13, 2018 | Completed final sign-off May 2020 | 238 Urbano Dr | new rear yard deck, per plans. two new door openings at rear of (e) building on 2nd floor per plansDetails
new rear yard deck, per plans. two new door openings at rear of (e) building on 2nd floor per plans | $30,000 |
| May 24, 2018 | Expired or cancelled cancelled Dec 2021 | 1326 44th Av | 2nd fl: add (n) half bathrooms, remodel both (e) bath, adding recessed light in (e) living room, kitchen, both bedroom. 1st fl: add (2) new bedrooms, (n) full baths & family room, electrical panel upgrade, sheet rock garage. remove deck and replace window.Details
2nd fl: add (n) half bathrooms, remodel both (e) bath, adding recessed light in (e) living room, kitchen, both bedroom. 1st fl: add (2) new bedrooms, (n) full baths & family room, electrical panel upgrade, sheet rock garage. remove deck and replace window. | $110,000 |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 2271 40th Av | redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade.Details
redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade. | $84,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2023 | 440 28th St | add a new garage at (n) b/f, driveway, garage roof to be basement deck. remove exterior wood stair from basement to first floor. replace exterior stair from sidewalk to basement.Details
add a new garage at (n) b/f, driveway, garage roof to be basement deck. remove exterior wood stair from basement to first floor. replace exterior stair from sidewalk to basement. | $80,000 |
| Sep 21, 2017 | Completed final sign-off Oct 2018 | 1052 Jamestown Av | comply with novs: #201036222, #201035459, #201280141, #201301901 & #201390651. rooms down. add 1 media room, 1 den, 1 gym room, and 1 half back - new deck at rear.(room down)Details
comply with novs: #201036222, #201035459, #201280141, #201301901 & #201390651. rooms down. add 1 media room, 1 den, 1 gym room, and 1 half back - new deck at rear.(room down) | $80,000 |
| May 6, 2016 | Completed final sign-off May 2017 | 57 Wentworth Pl | replace (e) sidewalk at east side of property along wentworth with new concrete sidewalk over metal deckDetails
replace (e) sidewalk at east side of property along wentworth with new concrete sidewalk over metal deck | $20,000 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 2471 46th Av | repair the railing for the deck less than 40% all repair in-kind. not visible from street.Details
repair the railing for the deck less than 40% all repair in-kind. not visible from street. | $1,800 |
| May 21, 2010 | Completed final sign-off Jun 2010 | 3238 Noriega St | construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan.Details
construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan. | $18,000 |