Back to bathroom remodel contractors
Topline Builders Corp
- Based in
- Daly City
- On San Francisco permits
- Feb 2006 to Oct 2022
- Last 24 months
- 0 permits filed
145 permits since 2000: 119 completed, 19 never finaled, 7 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
66 bathroom remodel permits: 60 completed, 3 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2021 | Completed final sign-off Dec 2021 | 659 Vienna St | new bathroom @ (e) 2/f kitchen location, relocate kitchen @ 2/f. no other work.Details
new bathroom @ (e) 2/f kitchen location, relocate kitchen @ 2/f. no other work. | $23,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2021 | 530 Scott St | apt 3: kitchen & bathroom remodel.Details
apt 3: kitchen & bathroom remodel. | $20,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2021 | 20 Southwood Dr | revision to pa# 202008202144: 1st fl remodel kitchen & bathroom, add 1 bedroom. 2nd fl remodel bathroom. replaced windows with all wood (no cladding) double hung windows with integrated ogees & muntins.Details
revision to pa# 202008202144: 1st fl remodel kitchen & bathroom, add 1 bedroom. 2nd fl remodel bathroom. replaced windows with all wood (no cladding) double hung windows with integrated ogees & muntins. | $35,000 |
| Sep 13, 2019 | Completed final sign-off Nov 2019 | 1921 Alemany Bl | add a mudroom, (2) bedrooms and a full bathroom on the 1st fl. replace water heater with tankless typeDetails
add a mudroom, (2) bedrooms and a full bathroom on the 1st fl. replace water heater with tankless type | $60,000 |
| Aug 8, 2019 | Completed final sign-off Oct 2021 | 1663 26th Av | 1/f:infill area at rear to alight w/2nd fl. add 1 foyer, 2 bedrms, 2 3-fix bathrm, 1 entertainment & 1 laundry; 2/f:reduce lightwell on north side; infill lightwell on south side; convert bedrm to office; remodel e master bedrm, bathrm & convert powder to full bath. reloca e kitch, dining, living rmDetails
1/f:infill area at rear to alight w/2nd fl. add 1 foyer, 2 bedrms, 2 3-fix bathrm, 1 entertainment & 1 laundry; 2/f:reduce lightwell on north side; infill lightwell on south side; convert bedrm to office; remodel e master bedrm, bathrm & convert powder to full bath. reloca e kitch, dining, living rm | $60,000 |
| Jul 15, 2019 | Completed final sign-off Oct 2019 | 946 Geary St | units 1 and 3. kitchen and bath remodels.Details
units 1 and 3. kitchen and bath remodels. | $42,000 |
| Jun 4, 2019 | Completed final sign-off May 2020 | 2748 Bush St | construct 1 bedroom, 1 full bathroom, 1 powder room & family room @ ground floor; remodel (e) kitchen, bathroom. add 1 full bathroom & 1 powder room @ 2nd floor; re-built (e) interior staircase from 2nd fl to ground floorDetails
construct 1 bedroom, 1 full bathroom, 1 powder room & family room @ ground floor; remodel (e) kitchen, bathroom. add 1 full bathroom & 1 powder room @ 2nd floor; re-built (e) interior staircase from 2nd fl to ground floor | $125,000 |
| Apr 4, 2019 | Completed final sign-off Dec 2019 | 57 Caine Av | revision to bpa #201810112959. basement: add 2 bedrooms & 2 full baths.Details
revision to bpa #201810112959. basement: add 2 bedrooms & 2 full baths. | $65,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 35 Cityview Wy | construct 2 bedrooms, 2 bath rooms & family room @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & upgrade partial ceiling joists @ 2nd fl; add tie beam at ground floor; repair exterior stucco in kind & front staircase (steps only)Details
construct 2 bedrooms, 2 bath rooms & family room @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & upgrade partial ceiling joists @ 2nd fl; add tie beam at ground floor; repair exterior stucco in kind & front staircase (steps only) | $110,000 |
| Mar 15, 2019 | Completed final sign-off May 2020 | 1453 26th Av | 1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stairDetails
1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stair | $80,000 |
| Feb 25, 2019 | Completed final sign-off Aug 2019 | 2294 33rd Av | remodel kitchen & 1-1/2 bathroom @ 2/f, replace windows @ back of house.Details
remodel kitchen & 1-1/2 bathroom @ 2/f, replace windows @ back of house. | $29,000 |
| Jan 22, 2019 | Completed final sign-off Jul 2020 | 2294 33rd Av | e kitchen, e bath, add 2 new bath rm 2nd fl. remodel under 201902253769. add one full bathrm at 2nd. remodel 2 bedrooms, bathrom and convert (e) garage to family rm and construct 2 bathrrom at ground floorDetails
e kitchen, e bath, add 2 new bath rm 2nd fl. remodel under 201902253769. add one full bathrm at 2nd. remodel 2 bedrooms, bathrom and convert (e) garage to family rm and construct 2 bathrrom at ground floor | $120,000 |
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 689 26th Av | to comply with nov201613531,201529882,201472296,201326721,201145650.201145747,201064407: 1/f-infill at rear, add 2 full bathrooms, 2 bedrooms and laundry. 2/f: total remodel, add 1 full bathroom, reconfgiure interior stairs and infill south lightwell, new rear siding and doors/wdws.Details
to comply with nov201613531,201529882,201472296,201326721,201145650.201145747,201064407: 1/f-infill at rear, add 2 full bathrooms, 2 bedrooms and laundry. 2/f: total remodel, add 1 full bathroom, reconfgiure interior stairs and infill south lightwell, new rear siding and doors/wdws. | $130,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2019 | 59 Caine Av | 2nd floor: remodel 1 kitchen and bathroom. add 1 full bathroom. new laundry and 3 (n) skylights w/ parapet for skylight workDetails
2nd floor: remodel 1 kitchen and bathroom. add 1 full bathroom. new laundry and 3 (n) skylights w/ parapet for skylight work | $30,000 |
| Oct 11, 2018 | Completed final sign-off Nov 2019 | 57 Caine Av | legalize in-law unit per ord# 43-14 on first flr w/ kitchen, living room, 2 full bath and 2 bedrooms. 2nd fl: new roof deck.Details
legalize in-law unit per ord# 43-14 on first flr w/ kitchen, living room, 2 full bath and 2 bedrooms. 2nd fl: new roof deck. | $90,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2018 | 156 Midcrest Wy | 1st fl: remodel bath, add closet in bedroom, new laundry. 2nd fl: remodel kitchen. open wall from living to dining.Details
1st fl: remodel bath, add closet in bedroom, new laundry. 2nd fl: remodel kitchen. open wall from living to dining. | $20,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2019 | 1767 31st Av | 1/f: add 2 bedrooms, 2 baths, & media room with wetbar. 2/f: relocate kitchen, rmeodel bath & add 1 bath & laundry. new deck at rear with sliding doors, window, & siding. replace front windows in-kind with alumn-clad wood windows.Details
1/f: add 2 bedrooms, 2 baths, & media room with wetbar. 2/f: relocate kitchen, rmeodel bath & add 1 bath & laundry. new deck at rear with sliding doors, window, & siding. replace front windows in-kind with alumn-clad wood windows. | $120,000 |
| Jul 25, 2018 | Completed final sign-off Jan 2019 | 1326 44th Av | add 1 new unit on ground floor (n) kitchen, living, dining 1 bath and 2 bedroom.; 2nd fl - add 1 half bath and remodel 1.5 baths. sheetrock garage and replace rear windows. comply with nov 201876872. ref 2018-009076enf & pa #201805240025.Details
add 1 new unit on ground floor (n) kitchen, living, dining 1 bath and 2 bedroom.; 2nd fl - add 1 half bath and remodel 1.5 baths. sheetrock garage and replace rear windows. comply with nov 201876872. ref 2018-009076enf & pa #201805240025. | $110,000 |
| Jul 5, 2018 | Completed final sign-off May 2019 | 1542 21st Av | add bath & bar sink on 3rd. remodel kit & bath add 2 bath & skylights, convert kitchen to bedroom, rearrange staircase on 2nd, add 2 bathrm 2 full bath, storage & family rm on 1st. replace w/alimn clad wood windows in kind at front. replace vinyl windows at rear. upgrade ele plm systemDetails
add bath & bar sink on 3rd. remodel kit & bath add 2 bath & skylights, convert kitchen to bedroom, rearrange staircase on 2nd, add 2 bathrm 2 full bath, storage & family rm on 1st. replace w/alimn clad wood windows in kind at front. replace vinyl windows at rear. upgrade ele plm system | $150,000 |
| Jun 12, 2018 | Completed final sign-off Oct 2018 | 701 Quintara St | residential interior remodel of structure to relocate (e) kitchen & living room on g/f to 2/f. relocate 2 bedrooms on 2nd fl to g/f. replace rear windows per plan. add new 1/2 bath on 2/f with new skylight. add new bath to g/f.Details
residential interior remodel of structure to relocate (e) kitchen & living room on g/f to 2/f. relocate 2 bedrooms on 2nd fl to g/f. replace rear windows per plan. add new 1/2 bath on 2/f with new skylight. add new bath to g/f. | $80,000 |
| May 24, 2018 | Expired or cancelled cancelled Dec 2021 | 1326 44th Av | 2nd fl: add (n) half bathrooms, remodel both (e) bath, adding recessed light in (e) living room, kitchen, both bedroom. 1st fl: add (2) new bedrooms, (n) full baths & family room, electrical panel upgrade, sheet rock garage. remove deck and replace window.Details
2nd fl: add (n) half bathrooms, remodel both (e) bath, adding recessed light in (e) living room, kitchen, both bedroom. 1st fl: add (2) new bedrooms, (n) full baths & family room, electrical panel upgrade, sheet rock garage. remove deck and replace window. | $110,000 |
| Apr 20, 2018 | Completed final sign-off Aug 2018 | 1806 19th Av | legalize extg bed room, family room, media room and 2 full bath rooms. all work at ground floor.Details
legalize extg bed room, family room, media room and 2 full bath rooms. all work at ground floor. | $42,000 |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 2271 40th Av | redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade.Details
redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade. | $84,000 |
| Apr 3, 2018 | Completed final sign-off Apr 2019 | 2085 Ocean Av | to comply with nov 201759402: remodel (e) kitchen & relocate (e) bathroom. relocate & install new door at (e) foyer & den. remove selection of wall and enlarge (e) bedroom and convert (e) bedroom den to a walk in closet.Details
to comply with nov 201759402: remodel (e) kitchen & relocate (e) bathroom. relocate & install new door at (e) foyer & den. remove selection of wall and enlarge (e) bedroom and convert (e) bedroom den to a walk in closet. | $25,000 |
| Mar 27, 2018 | Completed final sign-off Oct 2018 | 626 Monterey Bl | interior remodeling: relocate bathroom and remodel kitchen on 3/f. remove bearing wall and replace with wood beam & posts btween living room and kitchen.Details
interior remodeling: relocate bathroom and remodel kitchen on 3/f. remove bearing wall and replace with wood beam & posts btween living room and kitchen. | $30,000 |
| Mar 5, 2018 | Completed final sign-off Dec 2018 | 1252 Alemany Bl | 1)convert extg family room into 2 bedrooms. relocate full bath room and media room at ground floor. 2)remodel extg kitchen, bathroom, construct one new bath room. rebuilt interior stair, upgrade partial ceiling framing and construct 3 skylight at 2nd floor.Details
1)convert extg family room into 2 bedrooms. relocate full bath room and media room at ground floor. 2)remodel extg kitchen, bathroom, construct one new bath room. rebuilt interior stair, upgrade partial ceiling framing and construct 3 skylight at 2nd floor. | $72,000 |
| Feb 9, 2018 | Never finaled issued Mar 2018, no final | 3529 Mission St | 2nd floor: remove extg bathroom and kitchen. 1st floor: legalize 2 bedrooms, add 2 new full bathrooms and family room. replace windows at rear.Details
2nd floor: remove extg bathroom and kitchen. 1st floor: legalize 2 bedrooms, add 2 new full bathrooms and family room. replace windows at rear. | $85,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 55 Majestic Av | add 2 new bathroom on main floorDetails
add 2 new bathroom on main floor | $25,000 |
| Jan 9, 2018 | Completed final sign-off Jul 2018 | 246 Thrift St | comply w/nov #201707284 - legalize ground floor bathroom. remove sink under stairs. remove partition on 2nd floor.Details
comply w/nov #201707284 - legalize ground floor bathroom. remove sink under stairs. remove partition on 2nd floor. | $4,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2018 | 2132 18th Av | remodeling 1 (e) kitchen & 1 (e) bathroom on 2/f. no alt to walls, windows or doors.Details
remodeling 1 (e) kitchen & 1 (e) bathroom on 2/f. no alt to walls, windows or doors. | $16,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 1912 Sloat Bl | construct 2 bedrooms, 1 full bath, laundry at gr fl. remodel e kitchen, convert 1 bath to 2 full bath at 2nd fl.Details
construct 2 bedrooms, 1 full bath, laundry at gr fl. remodel e kitchen, convert 1 bath to 2 full bath at 2nd fl. | $68,000 |
| Aug 22, 2017 | Completed final sign-off Nov 2017 | 432 Broadway | to comply with complaint #201795552; 201791942. the heater, electrical receptacles improve; kitchen & bath faucets & drains & door, window, floor walls & fans repair, painting as well.Details
to comply with complaint #201795552; 201791942. the heater, electrical receptacles improve; kitchen & bath faucets & drains & door, window, floor walls & fans repair, painting as well. | $7,500 |
| Oct 28, 2016 | Completed final sign-off Jul 2019 | 80 Carrizal St | revision to 201410027947: remove 8 windows from addition. remove addition of bathroom on 2nd flr and bedroom on 1st. reduce cost of construction to $120,000Details
revision to 201410027947: remove 8 windows from addition. remove addition of bathroom on 2nd flr and bedroom on 1st. reduce cost of construction to $120,000 | |
| Sep 30, 2016 | Expired or cancelled expired Jun 2023 | 96 Williams Av | interior remodel on 1st floor. add 1 each full bathroom and 1 each bedroom and 1 each family room and 1 each laundry room.Details
interior remodel on 1st floor. add 1 each full bathroom and 1 each bedroom and 1 each family room and 1 each laundry room. | $30,000 |
| Aug 4, 2016 | Completed final sign-off Jan 2017 | 8 Gloria Ct | to add one full bathroom and remodel existing kitchen, one and half bathroom on 2nd floor per plan.Details
to add one full bathroom and remodel existing kitchen, one and half bathroom on 2nd floor per plan. | $30,000 |
| Nov 30, 2015 | Never finaled issued Nov 2015, no final | 156 Missouri St | unit #1 & #5 - replace the ktichen cabinets & replace the tile for the bathroom. upgrade the electrical for the kitchen, add the beam by the plan.Details
unit #1 & #5 - replace the ktichen cabinets & replace the tile for the bathroom. upgrade the electrical for the kitchen, add the beam by the plan. | $25,000 |
| Sep 4, 2015 | Expired or cancelled cancelled Sep 2019 | 1339 16th Av | add two gym & 2 bathrooms on 1/f per plan, garage door infill at front per plan.Details
add two gym & 2 bathrooms on 1/f per plan, garage door infill at front per plan. | $30,000 |
| Jan 29, 2015 | Never finaled issued Feb 2015, no final | 2689 23rd Av | add two bedrooms & one bathroom on 1st floor per plan.Details
add two bedrooms & one bathroom on 1st floor per plan. | $35,000 |
| Apr 11, 2014 | Completed final sign-off Dec 2014 | 1546 Alemany Bl | infill lightwell at 2/f; construct new bathroom, family, bedroom & laundry. relocate furnace & water heater at 1st floor. relocate kitchen, remodel bathroom & convert (e) kitchen to bedrooms. new light fixture & outlets, infill lightwell & remove (e) exterior stair @ 2nd floor. all work per plans.Details
infill lightwell at 2/f; construct new bathroom, family, bedroom & laundry. relocate furnace & water heater at 1st floor. relocate kitchen, remodel bathroom & convert (e) kitchen to bedrooms. new light fixture & outlets, infill lightwell & remove (e) exterior stair @ 2nd floor. all work per plans. | $49,000 |
| Jan 21, 2014 | Completed final sign-off Aug 2014 | 308 Turk St | remodel kitchen & bath at unit #7, 14, 16, 18 & 20. new paint at the unit. to fix the violation # 201278207; 201277902; 201275947; 201278222; 201278381, 201046940; 201383362; 201383381; 201383291; 201386552; 501282615, 201282618; 201282619; 201186120; 200682032; 201256341 & 20127861.Details
remodel kitchen & bath at unit #7, 14, 16, 18 & 20. new paint at the unit. to fix the violation # 201278207; 201277902; 201275947; 201278222; 201278381, 201046940; 201383362; 201383381; 201383291; 201386552; 501282615, 201282618; 201282619; 201186120; 200682032; 201256341 & 20127861. | $60,000 |
| Oct 24, 2013 | Completed final sign-off Jan 2015 | 4847 Geary Bl | unit #4847 geary bl: remodel extg bathroom and kitchen, relocate walls and demo walls. new outlets and light fixtures. replace extg windows at front. (11 windows) match existingDetails
unit #4847 geary bl: remodel extg bathroom and kitchen, relocate walls and demo walls. new outlets and light fixtures. replace extg windows at front. (11 windows) match existing | $28,000 |
| Jul 29, 2013 | Completed final sign-off Apr 2014 | 1270 York St | 2nd fl unit only,1270 york st: remodel e floor layout including new walls, remodel kitchen and bath, add new bath, elec outlets, lt fixtures,repair rear roof framing in kindDetails
2nd fl unit only,1270 york st: remodel e floor layout including new walls, remodel kitchen and bath, add new bath, elec outlets, lt fixtures,repair rear roof framing in kind | $40,000 |
| Jul 8, 2013 | Completed final sign-off Apr 2014 | 1270 York St | alter e floor layout at 1st fl, remodel e kitchen and bath, infill under e room (52 sf) new bath. replace stair at rear, new railing at e front patio, new outlet and light fixtures, new furnace and water heaterDetails
alter e floor layout at 1st fl, remodel e kitchen and bath, infill under e room (52 sf) new bath. replace stair at rear, new railing at e front patio, new outlet and light fixtures, new furnace and water heater | $40,000 |
| May 14, 2013 | Completed final sign-off Jun 2013 | 1 Robblee Av | add one bathroom on 1st floor per planDetails
add one bathroom on 1st floor per plan | $15,000 |
| Apr 12, 2013 | Completed final sign-off Aug 2013 | 21 Robblee Av | add one bedroom, mudroom and one bathroom on 1st fl per plan.Details
add one bedroom, mudroom and one bathroom on 1st fl per plan. | $28,000 |
| Sep 24, 2012 | Completed final sign-off Aug 2013 | 619 Visitacion Av | remove & fix the damage sheetrock, approx 100 sq.ft. each @ living room, 2 bedrooms, kitchen & bath. replace faucets and showerheads @ kitchen & bath.Details
remove & fix the damage sheetrock, approx 100 sq.ft. each @ living room, 2 bedrooms, kitchen & bath. replace faucets and showerheads @ kitchen & bath. | $3,500 |
| Aug 14, 2012 | Completed final sign-off Dec 2012 | 2319 Alemany Bl | legalize rooms at ground floor including 2 bedrooms, 2 bathrooms, 1 laundry & 1 storage room.Details
legalize rooms at ground floor including 2 bedrooms, 2 bathrooms, 1 laundry & 1 storage room. | $40,000 |
| Jul 31, 2012 | Completed final sign-off Jan 2013 | 830 Meade Av | at first floor, convert ext family space to bedrooms, and construct non bearing walls for new bathroom and laundry and hall way. remove extg interior stairs.Details
at first floor, convert ext family space to bedrooms, and construct non bearing walls for new bathroom and laundry and hall way. remove extg interior stairs. | $18,000 |
| Jul 18, 2012 | Completed final sign-off Jan 2013 | 45 Rolph St | to add one play room, two bedrm, two full bath, one storage and laundry on existing ground flr per planDetails
to add one play room, two bedrm, two full bath, one storage and laundry on existing ground flr per plan | $50,000 |
| Jun 15, 2012 | Completed final sign-off Dec 2012 | 2319 Alemany Bl | kitchen & bath remodeling, run new electrical & water supply. refinish damage plaster wall @ living area (patching only). comply with cec150(k)8 & cec150(k)10 for kitchen & bathroom remodel respectively.Details
kitchen & bath remodeling, run new electrical & water supply. refinish damage plaster wall @ living area (patching only). comply with cec150(k)8 & cec150(k)10 for kitchen & bathroom remodel respectively. | $26,800 |
| Apr 10, 2012 | Completed final sign-off Sep 2012 | 1021 York St | comply w/complaint #201281414 - demolition & construction included partitions for bathroom, kitchen, bedroom, lighitng, outlet, finishes & water heater & furnace.no changes to bldg envelope.Details
comply w/complaint #201281414 - demolition & construction included partitions for bathroom, kitchen, bedroom, lighitng, outlet, finishes & water heater & furnace.no changes to bldg envelope. | $36,000 |
| Mar 5, 2012 | Completed final sign-off Aug 2012 | 170 10th Av | legalize extg bath room and kitchen work in lower unit. to comply notice of violation #201117341, 201293053, 200715611 & 200714671.Details
legalize extg bath room and kitchen work in lower unit. to comply notice of violation #201117341, 201293053, 200715611 & 200714671. | $15,000 |
| Sep 28, 2011 | Completed final sign-off Apr 2012 | 3612 San Bruno Av | to add one play room,2 bedroom, one full bath room and one laundry room on extg ground floor per planDetails
to add one play room,2 bedroom, one full bath room and one laundry room on extg ground floor per plan | $45,000 |
| Aug 18, 2011 | Completed final sign-off Feb 2012 | 58 Belle Av | 1)to add 2 bedrooms, one family room, one full bathroom,one storage on extg ground floor per plan. 2)to add one new full bathroom, remodel extg bath room, kitchen and rewire on 2nd floor per plan.Details
1)to add 2 bedrooms, one family room, one full bathroom,one storage on extg ground floor per plan. 2)to add one new full bathroom, remodel extg bath room, kitchen and rewire on 2nd floor per plan. | $65,000 |
| Aug 11, 2011 | Completed final sign-off Oct 2011 | 416 Capitol Av | add two bedrooms, one full bath room on existing ground floor per plans.Details
add two bedrooms, one full bath room on existing ground floor per plans. | $50,000 |
| Jun 22, 2011 | Completed final sign-off Oct 2011 | 1021 York St | comply with complaint 201187387. remodel unit 1 and 2. new bathroom and enlarge e bedroom by infilling e lightwell. comply with his nov 200558471 and 1011087387.Details
comply with complaint 201187387. remodel unit 1 and 2. new bathroom and enlarge e bedroom by infilling e lightwell. comply with his nov 200558471 and 1011087387. | $40,000 |
| Dec 30, 2010 | Completed final sign-off Apr 2011 | 278 Raymond Av | remodel ground floor: add 2 bedrooms, 2 full bath rooms and laundry. remodel 2nd floor kitchen and two bath roomsDetails
remodel ground floor: add 2 bedrooms, 2 full bath rooms and laundry. remodel 2nd floor kitchen and two bath rooms | $60,000 |
| Aug 2, 2010 | Completed final sign-off Oct 2010 | 254 Pope St | to comply with nov# 200919950 dated oct.21.2009. remove all illegal rooms at ground flor. add two bedrooms, 2 full bathrooms at ground floor per plan.Details
to comply with nov# 200919950 dated oct.21.2009. remove all illegal rooms at ground flor. add two bedrooms, 2 full bathrooms at ground floor per plan. | $28,000 |
| Jun 9, 2010 | Completed final sign-off Oct 2010 | 236 Paris St | add 3 bedrooms, one play room, laundry room, two full bathrooms and one storage on ground floor. remodel 2nd fl kitchen, two full bathrooms, one 1/2 bathroom and rewiring. replace (e) damaged sheetrockDetails
add 3 bedrooms, one play room, laundry room, two full bathrooms and one storage on ground floor. remodel 2nd fl kitchen, two full bathrooms, one 1/2 bathroom and rewiring. replace (e) damaged sheetrock | $80,000 |
| May 21, 2010 | Completed final sign-off Jun 2010 | 3238 Noriega St | construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan.Details
construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan. | $18,000 |
| Mar 29, 2010 | Completed final sign-off Aug 2010 | 241 Winding Wy | new interior and exterior paint, replace 23 windows. 3 in front. new cabinets and countertop at kitchen and appliances installation. remodel baths(all)Details
new interior and exterior paint, replace 23 windows. 3 in front. new cabinets and countertop at kitchen and appliances installation. remodel baths(all) | $30,000 |
| Mar 17, 2010 | Completed final sign-off Jun 2010 | 315 Elliot St | to add new 2-bedroom, 1-storage and legalize (e) 1-full bathroom on (e) ground flr. per plan.Details
to add new 2-bedroom, 1-storage and legalize (e) 1-full bathroom on (e) ground flr. per plan. | $20,000 |
| Dec 28, 2009 | Completed final sign-off Mar 2010 | 1467 25th Av | add 2 bedrooms, 1 full bathroom, 1 half bathroom & 2 storages on (e) ground floor per planDetails
add 2 bedrooms, 1 full bathroom, 1 half bathroom & 2 storages on (e) ground floor per plan | $42,000 |
| Oct 25, 2006 | Completed final sign-off Apr 2008 | 1536 Lake St | rear horizontal addition on 2 levels to include new family room, & breakfast area. remodel & relocate (e) master bath.Details
rear horizontal addition on 2 levels to include new family room, & breakfast area. remodel & relocate (e) master bath. | $130,000 |
| Mar 28, 2006 | Completed final sign-off Jul 2006 | 762 Head St | interior remodel, relocate kitchen, add one bath, bedroom & laundry at 2nd fl, remodel bath, repair e stair, replace windows.Details
interior remodel, relocate kitchen, add one bath, bedroom & laundry at 2nd fl, remodel bath, repair e stair, replace windows. | $30,000 |
| Feb 16, 2006 | Completed final sign-off May 2006 | 3964 Alemany Bl | legalize 1 playroom, 1 bedroom & a full bath on ground floor per plan.Details
legalize 1 playroom, 1 bedroom & a full bath on ground floor per plan. | $20,000 |