Back to kitchen remodel contractors
Thomas Lebeau
- Based in
- Pacifica
- On San Francisco permits
- Sep 2014 to Dec 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 36 days from filing to permit and 1019 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2015 | Completed final sign-off Mar 2018 | 106 Delano Av | 1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm.Details
1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm. | $150,000 |