Thomas Lebeau

Contractor license
913769
State license record
Based in
Pacifica
On San Francisco permits
Sep 2014 to Dec 2016
Last 24 months
0 permits filed

5 permits since 2000: 4 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 2Kitchen remodel 1Bathroom remodel 2

2 bathroom remodel permits: 2 completed. Typically 18 days from filing to permit and 531 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 22, 2015Completed
final sign-off Mar 2018
106 Delano Av1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm.
Details
Permit
201504224348
Status
complete
Filed
Apr 22, 2015
Permit issued
May 28, 2015
Final sign-off
Mar 12, 2018
Declared cost
$150,000
Address
106 Delano Av

1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm.

Open the permit page

$150,000
Sep 23, 2014Completed
final sign-off Nov 2014
1371 06th Av2nd flr master bathroom and half-bath renovation. demo (e) interior walls, frame (2) pocket doors. utilities rough-ins. insulate, gypsum, install tub, tile walls and floor. install (2) operable lightwell ceiling windows. cabinetry and window casing
Details
Permit
201409237104
Status
complete
Filed
Sep 23, 2014
Permit issued
Sep 24, 2014
Final sign-off
Nov 6, 2014
Declared cost
$100,000
Address
1371 06th Av

2nd flr master bathroom and half-bath renovation. demo (e) interior walls, frame (2) pocket doors. utilities rough-ins. insulate, gypsum, install tub, tile walls and floor. install (2) operable lightwell ceiling windows. cabinetry and window casing

Open the permit page

$100,000