Block 3202, lot 003
106 Delano Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,730 sq ft
- Lot
- 3,197 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2015 | Never finaled issued Jul 2015, no final | 106 Delano Av | Thomas Lebeau | revision to pa #2015.0422.4348 - add details for inspection, add new footing under the garage hallway wall.Details
revision to pa #2015.0422.4348 - add details for inspection, add new footing under the garage hallway wall. | $1,000 |
| Apr 22, 2015 | Completed final sign-off Mar 2018 | 106 Delano Av | Thomas Lebeau | 1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm.Details
1st floor: add 490 sf liv sp w/connecting stair, add fam rm w/bar sink, new bath, new fire rated exit corridor, repalce new rear windows, excavate, new slab, underpin footing. 2nd fl: new stair to 1st fl, infill lightwell in kitchen, remodel kitchen, remove (e)stair, infill floor,remodel laundry rm. | $150,000 |
| Dec 12, 2011 | Completed final sign-off Jan 2012 | 106 Delano Av | Alan Zhu Construction | bathroom, tile, fan, faucet, floor tile, remodel bathroom, no change on walls and openingDetails
bathroom, tile, fan, faucet, floor tile, remodel bathroom, no change on walls and opening | $7,000 |
| Oct 31, 2011 | Completed final sign-off Jan 2012 | 106 Delano Av | Miyako Constr & Roofing Company | reroofingDetails
reroofing | $7,800 |
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 106 Delano Av | bolt down the foundation: install 5/8" galvanized bolt at 4 feet intervals on perimeter wall. 7 inch embed use hy 150 epoxy and 3 inch plate washer to secure the bolts. install metal fasteners on 6 post and beam connections in the garage area. install 5 - ply plyood panels on the shear wallsDetails
bolt down the foundation: install 5/8" galvanized bolt at 4 feet intervals on perimeter wall. 7 inch embed use hy 150 epoxy and 3 inch plate washer to secure the bolts. install metal fasteners on 6 post and beam connections in the garage area. install 5 - ply plyood panels on the shear walls | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Thomas Lebeau (2), Alan Zhu Construction, Miyako Constr & Roofing Company
- Engineers
- Jefferson Chen (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.