Thomas Doherty Construction Dba Doherty
- Based in
- Brentwood
- On San Francisco permits
- Jul 2015 to Jun 2026
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 6 in progress, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 in progress. Typically 18 days from filing to permit and 335 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jun 2026 | 363 Douglass St | revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closetDetails
revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closet | $9,370 |
| Oct 8, 2021 | Completed final sign-off Sep 2022 | 3534 Clay St | rear wall and rear stair vojuntary strengthening. 50% rear stair replacement in kind (same size and configurationDetails
rear wall and rear stair vojuntary strengthening. 50% rear stair replacement in kind (same size and configuration | $25,000 |
| Jun 14, 2021 | Completed final sign-off Jun 2024 | 1341 Union St | legalize and repair (e) roof deck to comply with nov# 20203225. 2nd egress ext to roof from existing ext stairs. to comply with bid nov 202023225 dated 3/30/2020.Details
legalize and repair (e) roof deck to comply with nov# 20203225. 2nd egress ext to roof from existing ext stairs. to comply with bid nov 202023225 dated 3/30/2020. | $3,500 |
| Aug 13, 2019 | Completed final sign-off Jan 2020 | 20 Genebern Wy | inkind repair of siding/stairs due to dry rot damage. all work repair in kind.Details
inkind repair of siding/stairs due to dry rot damage. all work repair in kind. | $15,000 |