Back to kitchen remodel contractors
Thomas Doherty Construction Dba Doherty
- Based in
- Brentwood
- On San Francisco permits
- Jul 2015 to Jun 2026
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 6 in progress, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2019 | Completed final sign-off Oct 2019 | 142 Beaumont Av | kitchen remodel: cabinet upgrade, new led can lights, new appliances, new floor tiles, new hood.Details
kitchen remodel: cabinet upgrade, new led can lights, new appliances, new floor tiles, new hood. | $13,500 |
| Sep 5, 2017 | Completed final sign-off May 2018 | 906 Noe St | kitchen and bath remodel - upgrade cabinets in kitchen, add new outlets to island upgrade existing appliances. bathroom (n) plumbing fixtures. repair dryrot, new tile in shower. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged.Details
kitchen and bath remodel - upgrade cabinets in kitchen, add new outlets to island upgrade existing appliances. bathroom (n) plumbing fixtures. repair dryrot, new tile in shower. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged. | $25,000 |
| Aug 3, 2016 | Completed final sign-off Jan 2017 | 417 Roosevelt Wy | interior remodel of kitchen and bath. now new square footage added. no changes to exterior. all work occurs wihin bldg footprintDetails
interior remodel of kitchen and bath. now new square footage added. no changes to exterior. all work occurs wihin bldg footprint | $35,000 |