Back to bathroom remodel contractors
Thomas Doherty Construction Dba Doherty
- Based in
- Brentwood
- On San Francisco permits
- Jul 2015 to Jun 2026
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 6 in progress, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jun 2026 | 363 Douglass St | revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closetDetails
revision to pa# 202512151823: repair ext. concrete stairs and add wood landing inside. non load bearing wall at bath and add closet. add 1/2 bath, replace 2 bath windows in-kind; adjust non load bearing wall @ bath & add closet | $9,370 |
| Dec 15, 2025 | In progress issued Dec 2025 | 363 Douglass St | basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundryDetails
basement - voluntary seismic upgrade. replace west half of floor with slab on grade and reframe east floor. create tradesman corridor. remove laundry and install wet bar. add bathroom. replace east windows and doors. 1/f - remove bath for breakfast nook. change east door to window. 2/f - add laundry | $108,600 |
| Sep 5, 2017 | Completed final sign-off May 2018 | 906 Noe St | kitchen and bath remodel - upgrade cabinets in kitchen, add new outlets to island upgrade existing appliances. bathroom (n) plumbing fixtures. repair dryrot, new tile in shower. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged.Details
kitchen and bath remodel - upgrade cabinets in kitchen, add new outlets to island upgrade existing appliances. bathroom (n) plumbing fixtures. repair dryrot, new tile in shower. no walls moved, removed, added, or infilled. all existing layouts to remain unchanged. | $25,000 |
| Aug 3, 2016 | Completed final sign-off Jan 2017 | 417 Roosevelt Wy | interior remodel of kitchen and bath. now new square footage added. no changes to exterior. all work occurs wihin bldg footprintDetails
interior remodel of kitchen and bath. now new square footage added. no changes to exterior. all work occurs wihin bldg footprint | $35,000 |