The Toboni Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2026
- Last 24 months
- 48 permits filed
270 permits since 2000: 194 completed, 46 in progress, 18 never finaled, 12 expired or cancelled.
Of the 18 never-finaled permits, 5 are 3 to 5 years old, 8 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
26 stairs permits: 20 completed, 4 in progress, 2 expired or cancelled. Typically 35 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | In progress issued Jun 2026 | 3701 Washington St | remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair.Details
remodel. replace (e) side entry door & (e) windows in kind. (n) sauna & cold plunge in basement. (n) mini ac system. (n) finishes. updated guardrail at main stair. | $150,000 |
| Jul 17, 2025 | Completed final sign-off Jun 2026 | 3447 Clay St | revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f.Details
revision to permit 202411185200. revised doors, windows at rear east facade. revised 4/f stair and skylights. bathroom added at 4/f. | $10,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 540 El Camino Del Mar | subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.Details
subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade. | $15,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 2420 Pacific Av | replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work.Details
replace/repair (e) front entry stair cladding in-kind due to leaks & cracking of (e) stone cladding on treads & risers. less than 50% repair work. | $90,000 |
| Aug 2, 2024 | In progress issued Oct 2024 | 2430 Pacific Av | interior remodel on all levels. revised stair in rear. new roof deck with operable skylightDetails
interior remodel on all levels. revised stair in rear. new roof deck with operable skylight | $250,000 |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 2710 Divisadero St | exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. workDetails
exploratory demo on all floors - no structural work. work in: basement, laundry, hall, and exterior stair, first floor dining room, second floor study, third floor hall 2. approx. 100 sq. of wall area. repairs to be done under future permits. +/- 100 sq. ft. work | $5,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2026 | 2900 Broadway | interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls.Details
interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls. | $1,500,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same heightDetails
temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same height | $2,000 |
| Jun 19, 2019 | Completed final sign-off Jan 2021 | 2720 Pierce St | interior remodel including associated structural work. work to include new layout to 1st & 3rd fls, with new baths & bedrooms. new stairs connecting 1st & 2nd fl.Details
interior remodel including associated structural work. work to include new layout to 1st & 3rd fls, with new baths & bedrooms. new stairs connecting 1st & 2nd fl. | $1,100,000 |
| Mar 11, 2019 | Expired or cancelled withdrawn Mar 2019 | 2747 Vallejo St | work consists of a (n) enclosed living space at the roof level of the (e) house. additional scope consists of the extension of the (e) elevator & stair to accommodate the (n) proposed level.Details
work consists of a (n) enclosed living space at the roof level of the (e) house. additional scope consists of the extension of the (e) elevator & stair to accommodate the (n) proposed level. | $150,000 |
| Jan 24, 2019 | Completed final sign-off Dec 2020 | 2747 Vallejo St | interior remodel of stairs from garage & first flr. minor facade remodel consisting of (n) entry stair, revised garage entry & (n) exterior finishesDetails
interior remodel of stairs from garage & first flr. minor facade remodel consisting of (n) entry stair, revised garage entry & (n) exterior finishes | $150,000 |
| Jan 4, 2019 | Completed final sign-off Dec 2020 | 2747 Vallejo St | revision to pa# 201809241215,minimal interior remodel within (e) bldg on1 & 2nd flr (n) stair @all floors front facade remodel with (n) entry door location & updated windows , doors & exterior finishesDetails
revision to pa# 201809241215,minimal interior remodel within (e) bldg on1 & 2nd flr (n) stair @all floors front facade remodel with (n) entry door location & updated windows , doors & exterior finishes | $500,000 |
| Sep 24, 2018 | Completed final sign-off Jan 2021 | 2747 Vallejo St | new operable skylight and new interior stair from 4th floor to roof deck. new roof deck with glass guardrail, cabinetry appliance.Details
new operable skylight and new interior stair from 4th floor to roof deck. new roof deck with glass guardrail, cabinetry appliance. | $50,000 |
| Sep 22, 2017 | Completed final sign-off Dec 2017 | 126 18th Av | replace some of the front stairs due to dry rot, cracking. replace cracked treads as needed. the brick balustrade is remaining untouched. less than 50%Details
replace some of the front stairs due to dry rot, cracking. replace cracked treads as needed. the brick balustrade is remaining untouched. less than 50% | $5,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2023 | 2720 Lyon St | interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairsDetails
interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairs | $300,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 330 Presidio Av | revision to pa #201707182105 - replace existing deck & stair (9209092) in-kind as required.Details
revision to pa #201707182105 - replace existing deck & stair (9209092) in-kind as required. | $1,500 |
| Mar 9, 2015 | Expired or cancelled cancelled Nov 2016 | 566 Kansas St | remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building.Details
remodel and addition at 3rd flr for master bedroom. addition of front & rear roof decks, interior remodel work to include kitchen . additional bath and misc. replace garage door. addition of new spiral stair case outside of building. | $235,000 |
| Jun 11, 2014 | Completed final sign-off Jul 2023 | 2720 Lyon St | widen (e) garage door. enlarge entry opening @ front facade. modify (e) rear facade window sizes & replace with windows & doors. add 42 sq. ft to ne corner of rear facade 1st floor. add a roof deck with spiral stair & elevator (stairs & elevator to be enclosed. infill north light well.Details
widen (e) garage door. enlarge entry opening @ front facade. modify (e) rear facade window sizes & replace with windows & doors. add 42 sq. ft to ne corner of rear facade 1st floor. add a roof deck with spiral stair & elevator (stairs & elevator to be enclosed. infill north light well. | $80,000 |
| Jan 31, 2014 | Completed final sign-off May 2015 | 3385 Jackson St | revision to permit #201312103794 remodel at 4/f with new terace, 2 new baths, remodel 1/2 bath, new doors and windows, new fire escape, extend stairs and elevator to new roof deck and mis improvementsDetails
revision to permit #201312103794 remodel at 4/f with new terace, 2 new baths, remodel 1/2 bath, new doors and windows, new fire escape, extend stairs and elevator to new roof deck and mis improvements | $145,000 |
| Dec 10, 2013 | Completed final sign-off May 2015 | 3385 Jackson St | remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement.Details
remodel kitchen and 1/2 baths, new elevator, replace extg staircase, remove 2 wood burning fire place and replace with 2 new direct vent gas furnace, new windows and doors and misc improvement. | $250,000 |
| Mar 22, 2013 | Completed final sign-off Mar 2014 | 68 Presidio Av | consolidation of all work previously appvd on pa# 2011/10/14/6891, pa# 2012/01/18/2486, pa# 2012/03/23/6788, pa# 2012/11/20/4610. replace in kind (e) wdw, single glazed wdws w/ new dbl glazed wood wdws. reconfigure (e) wdws, enlarge (e) wdws, replace (e) front stair in kind w/ stone stair, newDetails
consolidation of all work previously appvd on pa# 2011/10/14/6891, pa# 2012/01/18/2486, pa# 2012/03/23/6788, pa# 2012/11/20/4610. replace in kind (e) wdw, single glazed wdws w/ new dbl glazed wood wdws. reconfigure (e) wdws, enlarge (e) wdws, replace (e) front stair in kind w/ stone stair, new | $300,000 |
| Dec 4, 2012 | Completed final sign-off Sep 2013 | 2755 Fillmore St | rivision to pa#2011-0214-0216. delete (e) elevator. infill deck, guardrail & roof on north side. reconfigure stairs at ground level, north sideyard. convert (e) storage to (n) media room by provide mech ventilation & light.Details
rivision to pa#2011-0214-0216. delete (e) elevator. infill deck, guardrail & roof on north side. reconfigure stairs at ground level, north sideyard. convert (e) storage to (n) media room by provide mech ventilation & light. | $500 |
| Oct 11, 2012 | Completed final sign-off Nov 2013 | 2601 Broadway | cost revision to 201204067797 add 10,000 to job cost, interior only. $20,000.00 to rebuild lower section of main stair, less than 50%Details
cost revision to 201204067797 add 10,000 to job cost, interior only. $20,000.00 to rebuild lower section of main stair, less than 50% | $30,000 |
| Jun 4, 2010 | Completed final sign-off Oct 2011 | 2507 Pacific Av | interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircaseDetails
interior remodel at all levels incl. renovation of kitchen and 4 1/2 bathrooms, add new elevator and relocate staircase | $340,000 |
| Nov 30, 2009 | Completed final sign-off Dec 2010 | 2838 Polk St | rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement.Details
rebuild existing staircase at lightwell, addition at existing lightwell, new bay window at front facade, new stair & landing at rear, remodel (2) kitchens & (2) baths, add (2) baths, new dual glazed wood windows, misc improvement. | $360,000 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 3875 Clay St | excavate the rear of ex. garage to create a two car garage, new family rm, bath, new interior stair connecting 2nd flr, storage and relocate ex. water heater. reposition ex. furnance and reconnect to ex. flue.Details
excavate the rear of ex. garage to create a two car garage, new family rm, bath, new interior stair connecting 2nd flr, storage and relocate ex. water heater. reposition ex. furnance and reconnect to ex. flue. | $125,000 |