Back to kitchen remodel contractors
Teutonic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Sep 2025
- Last 24 months
- 5 permits filed
92 permits since 2000: 66 completed, 5 in progress, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 6 completed, 4 never finaled, 1 expired or cancelled. Typically 25 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2024 | Completed final sign-off Aug 2025 | 20 Woodside Av | to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structuralDetails
to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structural | $43,228 |
| Jan 26, 2024 | Completed final sign-off Oct 2024 | 4265 24th St | 1st fl above basement, remodel kitchenDetails
1st fl above basement, remodel kitchen | $60,000 |
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 2 Locust St | in kind window replacement with new dbl glazed units in kind kitchen remodel. in kind bath remodel.Details
in kind window replacement with new dbl glazed units in kind kitchen remodel. in kind bath remodel. | $50,000 |
| Feb 10, 2022 | Never finaled issued Apr 2022, no final | 1425 Folsom St | art gallery/event space w/bar, widening of egress components (doors, stairs, partitions) to allow for increase in allowable occupants. structural reinforcement & new equipment pad on lower roof for future equipment under separate permit. future kitchen remodel under separate permit.Details
art gallery/event space w/bar, widening of egress components (doors, stairs, partitions) to allow for increase in allowable occupants. structural reinforcement & new equipment pad on lower roof for future equipment under separate permit. future kitchen remodel under separate permit. | $50,000 |
| Apr 22, 2019 | Expired or cancelled expired Apr 2023 | 60 13th St | new commercial kitchen in new shipping container with new ramp and platform to access commercial ktichen. no change of use or occupancy groupDetails
new commercial kitchen in new shipping container with new ramp and platform to access commercial ktichen. no change of use or occupancy group | $82,948 |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 842 Valencia St | remodel e kitchen, relocate washrm, add seating bar, renovate (e) bar, install new lighting, removal of existing sign(wall mounted), patching in kind, (e) hvac system to remain.Details
remodel e kitchen, relocate washrm, add seating bar, renovate (e) bar, install new lighting, removal of existing sign(wall mounted), patching in kind, (e) hvac system to remain. | $220,000 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 71 Central Av | kitchen & bath remodels - replace fixtures- same locations, finishes, light fixturesDetails
kitchen & bath remodels - replace fixtures- same locations, finishes, light fixtures | $65,000 |
| Jul 19, 2013 | Completed final sign-off Dec 2014 | 20 Mountain Spring Av | interior renovation of existing: living - dining - kitchen area, master bath, guest bedroom, guest bath, lower level storage, skylight, media room window skylight and associated mechanical, electrical & plumbing.Details
interior renovation of existing: living - dining - kitchen area, master bath, guest bedroom, guest bath, lower level storage, skylight, media room window skylight and associated mechanical, electrical & plumbing. | $175,000 |
| Jan 27, 2011 | Completed final sign-off Jun 2012 | 64 Pierce St | non structural interior wall covering removal only. removal of wall covering for purposes of exploration. 2nd floor kitchen, poweder room. 3rd floor (2) bedroom(s) & bath.Details
non structural interior wall covering removal only. removal of wall covering for purposes of exploration. 2nd floor kitchen, poweder room. 3rd floor (2) bedroom(s) & bath. | $1,000 |
| Feb 21, 2007 | Completed final sign-off Feb 2010 | 121 Valley St | addition to rear and addition of 3rd level to (e) single family residence to create family room, enlarge kitchen and add two bedrooms and a bath.Details
addition to rear and addition of 3rd level to (e) single family residence to create family room, enlarge kitchen and add two bedrooms and a bath. | $80,000 |
| Nov 14, 2006 | Completed final sign-off Dec 2008 | 440 27th St | horizontal addition @ rear house including new family rm, study & bath at 1st fl. new kitchen, den, laundry rm @ 2nd fl.new interior stair fr 1st to 2nd fl.new deck&stairs to yd @rear. modify front door & entry hall.repair/replace front stairs&porch in kind.newgarage door.Details
horizontal addition @ rear house including new family rm, study & bath at 1st fl. new kitchen, den, laundry rm @ 2nd fl.new interior stair fr 1st to 2nd fl.new deck&stairs to yd @rear. modify front door & entry hall.repair/replace front stairs&porch in kind.newgarage door. | $250,000 |