Teutonic Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Sep 2025
- Last 24 months
- 5 permits filed
92 permits since 2000: 66 completed, 5 in progress, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 274 days from filing to permit and 449 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2024 | Completed final sign-off Dec 2024 | 100 Turquoise Wy | remove and replace existing deck using fortress steel decking system. reconfigure stairs in back yard.Details
remove and replace existing deck using fortress steel decking system. reconfigure stairs in back yard. | $57,000 |
| Sep 17, 2012 | Expired or cancelled cancelled Jan 2026 | 1205 Cole St | replace (e) wood deck with stairs in kind due to decayDetails
replace (e) wood deck with stairs in kind due to decay | $13,000 |
| Jun 23, 2010 | Completed final sign-off Jun 2012 | 64 Pierce St | add a 1st story horizontal addition in place of 1st story rear deck (variance in process). add bay window to rear 2nd story (variance in process) convert attic & part of basement to habitable. add dormers to rear portion of attic.Details
add a 1st story horizontal addition in place of 1st story rear deck (variance in process). add bay window to rear 2nd story (variance in process) convert attic & part of basement to habitable. add dormers to rear portion of attic. | $275,000 |
| Nov 14, 2006 | Completed final sign-off Dec 2008 | 440 27th St | horizontal addition @ rear house including new family rm, study & bath at 1st fl. new kitchen, den, laundry rm @ 2nd fl.new interior stair fr 1st to 2nd fl.new deck&stairs to yd @rear. modify front door & entry hall.repair/replace front stairs&porch in kind.newgarage door.Details
horizontal addition @ rear house including new family rm, study & bath at 1st fl. new kitchen, den, laundry rm @ 2nd fl.new interior stair fr 1st to 2nd fl.new deck&stairs to yd @rear. modify front door & entry hall.repair/replace front stairs&porch in kind.newgarage door. | $250,000 |