Taico Builder Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2013 to Mar 2026
- Last 24 months
- 1 permit filed
57 permits since 2000: 47 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 10 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2019 | Completed final sign-off Jul 2020 | 756 Potrero Av | propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facadeDetails
propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facade | $52,000 |
| Nov 7, 2019 | Completed final sign-off Jan 2020 | 1275 08th Av | correct nov complaint #201994652. 1) repair the dry rot decking, stair and handrail < 50% 2) patch holes in the boiler room 3) remove the peeling paint and repaint on the exterior wall.Details
correct nov complaint #201994652. 1) repair the dry rot decking, stair and handrail < 50% 2) patch holes in the boiler room 3) remove the peeling paint and repaint on the exterior wall. | $8,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 326 01st St | revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance.Details
revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance. | |
| May 27, 2016 | Completed final sign-off Aug 2017 | 49 Kearny St | new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existingDetails
new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existing | $90,000 |
| Mar 31, 2016 | Completed final sign-off Mar 2019 | 411 Ofarrell St | to comply with nov 201254442: interior work only: remodel (e) hoste lobby on ground floor. relocate (e) ada restroom. voluntary upgrade of stair handrail from lobby to mezzanine level. fire/mep - under sep permit. remove atm machine from interior. other pa 2014-0912-6171 for related site. n/a maherDetails
to comply with nov 201254442: interior work only: remodel (e) hoste lobby on ground floor. relocate (e) ada restroom. voluntary upgrade of stair handrail from lobby to mezzanine level. fire/mep - under sep permit. remove atm machine from interior. other pa 2014-0912-6171 for related site. n/a maher | $100,000 |