Taico Builder Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2013 to Mar 2026
- Last 24 months
- 1 permit filed
57 permits since 2000: 47 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2023 | In progress issued Oct 2023 | 574 44th Av | fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072.Details
fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072. | $220,000 |
| Dec 3, 2019 | Completed final sign-off Jul 2020 | 756 Potrero Av | propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facadeDetails
propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facade | $52,000 |
| May 8, 2019 | Completed final sign-off Apr 2021 | 206 Monterey Bl | front bldg: 1st flr - convert (e) storage space to (n) adu w/ 2 bedrooms, 2 full bathrooms, kitchen, living/dining area per ord# 162-16. 2nd flr - remodel bathroom, add a full bathroom, add a bedroom, relocate kitchen.Details
front bldg: 1st flr - convert (e) storage space to (n) adu w/ 2 bedrooms, 2 full bathrooms, kitchen, living/dining area per ord# 162-16. 2nd flr - remodel bathroom, add a full bathroom, add a bedroom, relocate kitchen. | $100,000 |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 1543 37th Av | kitchen remodel, replacing cabinets & granite counter top, appliances, & sink keep in hte same locationDetails
kitchen remodel, replacing cabinets & granite counter top, appliances, & sink keep in hte same location | $7,000 |
| Mar 24, 2017 | Completed final sign-off Jul 2017 | 52 Vesta St | remodel kitchenDetails
remodel kitchen | $8,500 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 326 01st St | revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance.Details
revision to 201505156452. reconfigure brewery and stair layout. no change to kitchen,restroom,entrance. | |
| Mar 1, 2016 | Completed final sign-off May 2016 | 279 Montana St | kitchen remodel on second floor. sink, stove all at the same location. no change to walls, doors and openings. no structural work.Details
kitchen remodel on second floor. sink, stove all at the same location. no change to walls, doors and openings. no structural work. | $8,000 |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph.Details
pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph. | |
| Nov 30, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | 88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks.Details
88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks. | $31,000 |
| Jul 22, 2015 | Completed final sign-off May 2016 | 121 Marview Wy | 1st floor: construct new wall for new bathrooms, bedrooms, and family. 2nd floor: remodel extg kitchen and bathrooms, remove wall and install new beam and posts. new light fixtures and outlets. replace 3 front windows with alum. cladded window. replace rear window.Details
1st floor: construct new wall for new bathrooms, bedrooms, and family. 2nd floor: remodel extg kitchen and bathrooms, remove wall and install new beam and posts. new light fixtures and outlets. replace 3 front windows with alum. cladded window. replace rear window. | $49,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 2330 33rd Av | kitchen remodel. new 100amp panel. no wall modification/no structural work.Details
kitchen remodel. new 100amp panel. no wall modification/no structural work. | $6,000 |