Block 0310, lot 002
49 Kearny St
- City’s use
- Commercial Retail
- Built
- 1908
- Stories
- 8
- Units
- 3
- Rooms
- 8 bathrooms
- Building
- 8,630 sq ft
- Lot
- 1,210 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 49 Kearny St | suite 101. non-electric, single faced sign. sign name: kp 49 sandwiches.Details
suite 101. non-electric, single faced sign. sign name: kp 49 sandwiches. | $2,000 | |
| Dec 21, 2020 | Never finaled issued Sep 2022, no final | 49 Kearny St | Zarc Construction Inc | change of use from coffee shop to medical cannabis retail at ground flr & integration w/3rd flr as part of expansion of (e) medical cannabis dispensary. remaining m occupancy. no cultivation/manufacturing on the permit. no work done.Details
change of use from coffee shop to medical cannabis retail at ground flr & integration w/3rd flr as part of expansion of (e) medical cannabis dispensary. remaining m occupancy. no cultivation/manufacturing on the permit. no work done. | |
| Apr 16, 2019 | Expired or cancelled cancelled Jul 2024 | 49 Kearny St | change of use from office to medical cannabis dispensary @ 2nd fl & integration with 3rd fl as part of expansion of existing medical cannabis dispensary. **maher n/a**Details
change of use from office to medical cannabis dispensary @ 2nd fl & integration with 3rd fl as part of expansion of existing medical cannabis dispensary. **maher n/a** | $500 | |
| Mar 12, 2018 | Never finaled filed Mar 2018, never issued | 49 Kearny St | change of use from mcd to cannabis retail on 3rd flr. ref# 2016-0913-7583Details
change of use from mcd to cannabis retail on 3rd flr. ref# 2016-0913-7583 | ||
| Jun 1, 2017 | Completed final sign-off Sep 2017 | 49 Kearny St | Crime Watch Security Sys Llc | installation of a (n) manual fire alarm system. ref pa# 2015/12/01/3830. ** maher: n/a **Details
installation of a (n) manual fire alarm system. ref pa# 2015/12/01/3830. ** maher: n/a ** | $15,000 |
| Nov 1, 2016 | Completed final sign-off Aug 2017 | 49 Kearny St | Taico Builder Inc | remove non-original aluminum storefront on storefront elevation on kearny st. replace with new steel storefront with two doors; maher n/aDetails
remove non-original aluminum storefront on storefront elevation on kearny st. replace with new steel storefront with two doors; maher n/a | $50,000 |
| Sep 13, 2016 | Completed final sign-off Jul 2017 | 49 Kearny St | 3rd floor; proposed is change of use from retail to mcd. bldg is a category "a" historic building. scope of work is limited to interior work @ floor 3 only. no new walls or removal of (e) walls. install a sales counter. no change to restroom / exterior elevations. ** maher: n/a **Details
3rd floor; proposed is change of use from retail to mcd. bldg is a category "a" historic building. scope of work is limited to interior work @ floor 3 only. no new walls or removal of (e) walls. install a sales counter. no change to restroom / exterior elevations. ** maher: n/a ** | $5,000 | |
| Jul 20, 2016 | Completed final sign-off Oct 2017 | 49 Kearny St | Taico Builder Inc | revision to pa #201512013830 - revision to sheet a201 - show lighting notes on enlarged bathroom plan that refer to title 24 energy compliance. n/a maher ordinanceDetails
revision to pa #201512013830 - revision to sheet a201 - show lighting notes on enlarged bathroom plan that refer to title 24 energy compliance. n/a maher ordinance | |
| May 27, 2016 | Completed final sign-off Aug 2017 | 49 Kearny St | Taico Builder Inc | new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existingDetails
new tenant a1 (tea cafe/shop) @ ground flr. tenant a2 (yoga studio) in (e) vacant ground/basement. scope of work limited to interior only. improve e stair and under sidewalk area at basement. replace egress stair ground thru 2nd fl.replace mezz restroom. new elec to replace existing | $90,000 |
| Dec 1, 2015 | Completed final sign-off Aug 2017 | 49 Kearny St | Taico Builder Inc | category a historic building: scope of work limited to interior floors 3 thru 8. provide accessible restroom at floors 3 thru 8. upgrade electrical on all (3-8) floors to replace existing. remove carpet and misc. finishes & replace and demolish partial height cubicle walls; maher n/aDetails
category a historic building: scope of work limited to interior floors 3 thru 8. provide accessible restroom at floors 3 thru 8. upgrade electrical on all (3-8) floors to replace existing. remove carpet and misc. finishes & replace and demolish partial height cubicle walls; maher n/a | $69,000 |
| Jun 7, 2011 | Completed final sign-off Jul 2011 | 49 Kearny St | A C Contracting | sub sidewalk replacementDetails
sub sidewalk replacement | $3,000 |
| Mar 3, 2006 | Expired or cancelled cancelled Oct 2011 | 49 Kearny St | convert office use to residential unit floors 2-8 also repair stairs and elevetor.Details
convert office use to residential unit floors 2-8 also repair stairs and elevetor. | $400,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Taico Builder Inc (4), A C Contracting, Crime Watch Security Sys Llc, Zarc Construction Inc
- Architects
- Peter Ekstein (4), Karen Mar (3)
- Designers
- Karen Mar, Oris Design
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.