T T Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Jul 2015
- Last 24 months
- 0 permits filed
32 permits since 2000: 27 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 59 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2010 | Completed final sign-off Jun 2011 | 2311 35th Av | revision to pa# 2010.11.09.4652. rebuild exterior stair and landing at existing location at front in kind. repair stucco at front and side (next to stair wall)Details
revision to pa# 2010.11.09.4652. rebuild exterior stair and landing at existing location at front in kind. repair stucco at front and side (next to stair wall) | $4,500 |
| Nov 9, 2010 | Never finaled issued Nov 2010, no final | 2311 35th Av | repair front stair leaking and dry rot on supporting wood. patch up with stuccco on repaired area.Details
repair front stair leaking and dry rot on supporting wood. patch up with stuccco on repaired area. | $4,500 |
| Sep 7, 2010 | Completed final sign-off Nov 2010 | 525 Garfield St | rebuild (e) stairway at rear yard. no change to size or location.Details
rebuild (e) stairway at rear yard. no change to size or location. | $2,800 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 762 08th Av | repair yard rotten stair post and landing (less than 50% of the stairs)Details
repair yard rotten stair post and landing (less than 50% of the stairs) | $1,800 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 401 17th Av | remodel (e) kitchen. open doorway to (e) back stair.Details
remodel (e) kitchen. open doorway to (e) back stair. | $9,000 |
| Jul 23, 2010 | Completed final sign-off Nov 2010 | 424 Cabrillo St | replace stair handrail only, no other work (interior stairs) in kindDetails
replace stair handrail only, no other work (interior stairs) in kind | $1,000 |
| Sep 29, 2009 | Completed final sign-off Apr 2010 | 3800 San Bruno Av | new bathroom at 2nd floor, new bathroom & entertainment room at 1st floor, new internal stairs to connect 1st & 2nd floors. 2 new windows at 2nd floor, new windows at 1st floorDetails
new bathroom at 2nd floor, new bathroom & entertainment room at 1st floor, new internal stairs to connect 1st & 2nd floors. 2 new windows at 2nd floor, new windows at 1st floor | $40,000 |
| Nov 26, 2008 | Completed final sign-off Dec 2008 | 1449 Leavenworth St | repair back stair. repair 11 steps of water damaged steps.Details
repair back stair. repair 11 steps of water damaged steps. | $750 |