Back to bathroom remodel contractors
T T Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Jul 2015
- Last 24 months
- 0 permits filed
32 permits since 2000: 27 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 2 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2015 | Completed final sign-off Dec 2015 | 1639 30th Av | reconstruct (e) bathroom on lower level; local installation of plywood sheathing on lower level walls per plan.Details
reconstruct (e) bathroom on lower level; local installation of plywood sheathing on lower level walls per plan. | $30,000 |
| Jan 17, 2014 | Completed final sign-off May 2014 | 650 Banks St | add new laundry closet, one new bedroom & one full bathroom on first floor per plan.Details
add new laundry closet, one new bedroom & one full bathroom on first floor per plan. | $32,750 |
| Jan 17, 2014 | Completed final sign-off May 2014 | 650 Banks St | remodel kitchen & bathroom 2/f; to comply with cec150(k) 8 & 10Details
remodel kitchen & bathroom 2/f; to comply with cec150(k) 8 & 10 | $22,000 |
| Jun 17, 2013 | Completed final sign-off Mar 2014 | 43 Stoneyford Av | legalize 1 bedroom. relocate 1 e bath. 1 new bedroom, convert e storage room into laundry room. all work at gr flDetails
legalize 1 bedroom. relocate 1 e bath. 1 new bedroom, convert e storage room into laundry room. all work at gr fl | $28,000 |
| Jul 25, 2011 | Completed final sign-off Mar 2012 | 1210 32nd Av | ground floor-remodel family room, bathroom, bedroom. add study, bedroom & laundry roomDetails
ground floor-remodel family room, bathroom, bedroom. add study, bedroom & laundry room | $48,000 |
| Apr 28, 2011 | Completed final sign-off Aug 2011 | 274 Minerva St | add full bathroom, laundry, and bedroom at ground floor.Details
add full bathroom, laundry, and bedroom at ground floor. | $28,000 |
| Nov 30, 2009 | Completed final sign-off Apr 2010 | 3800 San Bruno Av | remodel kitchen and bath on 2nd floor. provide h.c. lighting per title 24Details
remodel kitchen and bath on 2nd floor. provide h.c. lighting per title 24 | $15,000 |
| Sep 29, 2009 | Completed final sign-off Apr 2010 | 3800 San Bruno Av | new bathroom at 2nd floor, new bathroom & entertainment room at 1st floor, new internal stairs to connect 1st & 2nd floors. 2 new windows at 2nd floor, new windows at 1st floorDetails
new bathroom at 2nd floor, new bathroom & entertainment room at 1st floor, new internal stairs to connect 1st & 2nd floors. 2 new windows at 2nd floor, new windows at 1st floor | $40,000 |
| Jul 1, 2009 | Completed final sign-off Sep 2009 | 419 43rd Av | legalize bathroom, study at ground floor. new bathroom and storage at ground floor. remove wetbarDetails
legalize bathroom, study at ground floor. new bathroom and storage at ground floor. remove wetbar | $20,000 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 1418 43rd Av | interior remodel on ground floor, remodel, rebuilt bathroom, (n) bedroom, remodel family room, partial replacement of foundation & slab. new footin sill bolted to existing wall @ ground floor.Details
interior remodel on ground floor, remodel, rebuilt bathroom, (n) bedroom, remodel family room, partial replacement of foundation & slab. new footin sill bolted to existing wall @ ground floor. | $40,000 |
| Sep 30, 2008 | Completed final sign-off Aug 2009 | 424 Cabrillo St | interior remodeling on 3rd floor, add bathroom and closet.Details
interior remodeling on 3rd floor, add bathroom and closet. | $10,000 |