Back to kitchen remodel contractors
T T Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Jul 2015
- Last 24 months
- 0 permits filed
32 permits since 2000: 27 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2014 | Completed final sign-off May 2014 | 650 Banks St | remodel kitchen & bathroom 2/f; to comply with cec150(k) 8 & 10Details
remodel kitchen & bathroom 2/f; to comply with cec150(k) 8 & 10 | $22,000 |
| Jun 20, 2012 | Completed final sign-off Dec 2012 | 1623 40th Av | kitchen remodel with same layout as existing.Details
kitchen remodel with same layout as existing. | $9,500 |
| Mar 19, 2012 | Completed final sign-off Feb 2013 | 525 Garfield St | kitchen remodel, same as existing layout, upgrade main electrical service panels, repl 5 existing windows and sliding at yard (back of house), max u factor .4 ;all (n) lighting must comply with cec 150(k) 10Details
kitchen remodel, same as existing layout, upgrade main electrical service panels, repl 5 existing windows and sliding at yard (back of house), max u factor .4 ;all (n) lighting must comply with cec 150(k) 10 | $20,000 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 401 17th Av | remodel (e) kitchen. open doorway to (e) back stair.Details
remodel (e) kitchen. open doorway to (e) back stair. | $9,000 |
| Nov 30, 2009 | Completed final sign-off Apr 2010 | 3800 San Bruno Av | remodel kitchen and bath on 2nd floor. provide h.c. lighting per title 24Details
remodel kitchen and bath on 2nd floor. provide h.c. lighting per title 24 | $15,000 |
| Nov 26, 2008 | Completed final sign-off Mar 2009 | 2034 Alemany Bl | kitchen cabinets on 2nd floor.Details
kitchen cabinets on 2nd floor. | $4,500 |