T L Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2020
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 2 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 101 Banks St | enlarge existing bathroom to include walk in shower, replace toilet, sink, vanity. replace 2 e rear windows dbl paned, replace carpet w wood or wood like flooring, install door between gerage and hall to bedroom to allow entry without stairs.Details
enlarge existing bathroom to include walk in shower, replace toilet, sink, vanity. replace 2 e rear windows dbl paned, replace carpet w wood or wood like flooring, install door between gerage and hall to bedroom to allow entry without stairs. | $48,000 |
| Sep 11, 2013 | Completed final sign-off Apr 2014 | 1078 Tennessee St | repair and replace back stair landings in kindDetails
repair and replace back stair landings in kind | $5,000 |