Back to bathroom remodel contractors
T L Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2020
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 6 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 101 Banks St | enlarge existing bathroom to include walk in shower, replace toilet, sink, vanity. replace 2 e rear windows dbl paned, replace carpet w wood or wood like flooring, install door between gerage and hall to bedroom to allow entry without stairs.Details
enlarge existing bathroom to include walk in shower, replace toilet, sink, vanity. replace 2 e rear windows dbl paned, replace carpet w wood or wood like flooring, install door between gerage and hall to bedroom to allow entry without stairs. | $48,000 |
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 1239 Powell St | unit #6 - replace kitchen & bathroom cabinets & fixtures, update electric, electrical & plumbing under separate permit. compliance with ordinance #155-13 not requiredDetails
unit #6 - replace kitchen & bathroom cabinets & fixtures, update electric, electrical & plumbing under separate permit. compliance with ordinance #155-13 not required | $23,800 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 186 Shakespeare St | remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor.Details
remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor. | $34,500 |
| Mar 22, 2013 | Completed final sign-off Dec 2013 | 38 Chicago Wy | legalize e ground floor to comply with complaint 200230130. 1 bedroom, 1 full bathDetails
legalize e ground floor to comply with complaint 200230130. 1 bedroom, 1 full bath | $15,000 |
| Mar 7, 2013 | Completed final sign-off May 2013 | 38 Chicago Wy | replace kitchen cabinets, floor covering and sink. replace bathroom tub and sink and toilet. up-date electricDetails
replace kitchen cabinets, floor covering and sink. replace bathroom tub and sink and toilet. up-date electric | $6,000 |
| Jun 22, 2010 | Completed final sign-off Nov 2010 | 333 Masonic Av | replace kitchen cabinets, update electric in 2nd fl unit. replace bathroom, tiles, toilets and tub. update electric on 1st and 2nd floor unit. no lighting changes.Details
replace kitchen cabinets, update electric in 2nd fl unit. replace bathroom, tiles, toilets and tub. update electric on 1st and 2nd floor unit. no lighting changes. | $8,000 |