Back to kitchen remodel contractors
T L Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2020
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2020 | Never finaled issued Oct 2020, no final | 86 Valparaiso St | kitchen remodel: update existing electric, replace kitchen cabinets and countertop. install new fixtures & appliances.Details
kitchen remodel: update existing electric, replace kitchen cabinets and countertop. install new fixtures & appliances. | $17,000 |
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 1239 Powell St | unit #6 - replace kitchen & bathroom cabinets & fixtures, update electric, electrical & plumbing under separate permit. compliance with ordinance #155-13 not requiredDetails
unit #6 - replace kitchen & bathroom cabinets & fixtures, update electric, electrical & plumbing under separate permit. compliance with ordinance #155-13 not required | $23,800 |
| Jan 31, 2014 | Completed final sign-off Sep 2014 | 186 Shakespeare St | remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor.Details
remodel kitchen/dining area and bathroom: replace floor with tile, repl kitchen cabinets & countertop, add dishwasher, skylight. teardown wall separating dining area from living room. repl tub, pedestal sink, toilet and vinyl floor with new tub, vanity/sink toilet and tile floor. | $34,500 |
| Mar 7, 2013 | Completed final sign-off May 2013 | 38 Chicago Wy | replace kitchen cabinets, floor covering and sink. replace bathroom tub and sink and toilet. up-date electricDetails
replace kitchen cabinets, floor covering and sink. replace bathroom tub and sink and toilet. up-date electric | $6,000 |
| Jun 22, 2010 | Completed final sign-off Nov 2010 | 333 Masonic Av | replace kitchen cabinets, update electric in 2nd fl unit. replace bathroom, tiles, toilets and tub. update electric on 1st and 2nd floor unit. no lighting changes.Details
replace kitchen cabinets, update electric in 2nd fl unit. replace bathroom, tiles, toilets and tub. update electric on 1st and 2nd floor unit. no lighting changes. | $8,000 |
| Sep 17, 2008 | Completed final sign-off Jan 2009 | 801 Shotwell St | voluntary local strengthening. installation of 5-1/4"x11-7/8"x12'0" parallam beam with 1-3/4"x11-7/8"x12'0" long ledger end supports across living room and kitchen @ 1sr floor.Details
voluntary local strengthening. installation of 5-1/4"x11-7/8"x12'0" parallam beam with 1-3/4"x11-7/8"x12'0" long ledger end supports across living room and kitchen @ 1sr floor. | $2,900 |
| Jun 18, 2008 | Completed final sign-off Sep 2008 | 333 Masonic Av | kitchen upgrade - kitchen cabinets, sink, lights, range, hood and outlets.Details
kitchen upgrade - kitchen cabinets, sink, lights, range, hood and outlets. | $8,500 |