T.D. Hurray Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jan 2018
- Last 24 months
- 0 permits filed
32 permits since 2000: 26 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2009 | Completed final sign-off Jan 2010 | 56 Elgin Pk | kitchen remodel-change window size to smaller window so countertop won't interfer with window. (window located in the side of the house toward rear).Details
kitchen remodel-change window size to smaller window so countertop won't interfer with window. (window located in the side of the house toward rear). | $5,300 |
| Mar 21, 2008 | Completed final sign-off Jun 2008 | 550 Davis St | kitchen remodel - replace cabinets and apapliances in kind. upgrade electrical plumbing stays in same location, plumbing and electrical under separate permitDetails
kitchen remodel - replace cabinets and apapliances in kind. upgrade electrical plumbing stays in same location, plumbing and electrical under separate permit | $3,500 |
| May 9, 2007 | Completed final sign-off Jan 2008 | 678 Waller St | kitchen remodel-plumbing stays in same position new elect. take out both pocket door and maek one 48" opening and the other 36" renovation to comply with t-24 energy codes.Details
kitchen remodel-plumbing stays in same position new elect. take out both pocket door and maek one 48" opening and the other 36" renovation to comply with t-24 energy codes. | $6,500 |
| Oct 26, 2006 | Completed final sign-off Feb 2007 | 3315 Fillmore St | work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent.Details
work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent. | $10,000 |