Back to bathroom remodel contractors
T.D. Hurray Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jan 2018
- Last 24 months
- 0 permits filed
32 permits since 2000: 26 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 2 never finaled. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2018 | Never finaled issued Feb 2018, no final | 5553 Diamond Heights Bl | interior remodel of existing family room & utility room, new bathroom at lower level. windows replaced, convert existing family room to master bedroomDetails
interior remodel of existing family room & utility room, new bathroom at lower level. windows replaced, convert existing family room to master bedroom | $44,602 |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 4630 17th St | unit 4630. bath remodel, shower & toilet stay in some spot, (e) double sinks to move over to right a few feet.Details
unit 4630. bath remodel, shower & toilet stay in some spot, (e) double sinks to move over to right a few feet. | $9,037 |
| Feb 3, 2010 | Completed final sign-off Mar 2010 | 121 Lincoln Wy | 1) remodel existing bathroom: sink, tub, and replace (e) shower with toilet. 2) add small sink to (e) water closet. work on unit 121 on second floor. no wall removalDetails
1) remodel existing bathroom: sink, tub, and replace (e) shower with toilet. 2) add small sink to (e) water closet. work on unit 121 on second floor. no wall removal | $10,000 |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 115 Merced Av | 2nd floor bathroom remodel: replace in kind except move non-structural wall back 6" to 8" for plumbing tree. also center lights above tub/frame out 2x6 to move one truss to except new centered lights.Details
2nd floor bathroom remodel: replace in kind except move non-structural wall back 6" to 8" for plumbing tree. also center lights above tub/frame out 2x6 to move one truss to except new centered lights. | $8,250 |
| Jul 15, 2008 | Completed final sign-off Sep 2008 | 1683 37th Av | remodel full bath. move toilet. add double sink where tub was. no structural work.Details
remodel full bath. move toilet. add double sink where tub was. no structural work. | $6,454 |
| Oct 15, 2007 | Completed final sign-off May 2008 | 955 Bay St | full bath remodel: demo to bare framing-run new feed lines, new showr pan, tub, toilet & sink, replace in kind with same demensions, tile floors, pan + walls. lighting comply w/title 24.Details
full bath remodel: demo to bare framing-run new feed lines, new showr pan, tub, toilet & sink, replace in kind with same demensions, tile floors, pan + walls. lighting comply w/title 24. | $6,500 |
| Aug 28, 2007 | Completed final sign-off Nov 2007 | 2185 Bush St | full bath remodel:upstairs replace tub, sink ,toilet,. replace exhaust fan and lights and gfi plugs.(basically replace in kind) tile tub around 1/2 bath downstairs. replace toilet, sink and faucet and exhaust fan and light fixtures. provide flourescent or os in bathroomDetails
full bath remodel:upstairs replace tub, sink ,toilet,. replace exhaust fan and lights and gfi plugs.(basically replace in kind) tile tub around 1/2 bath downstairs. replace toilet, sink and faucet and exhaust fan and light fixtures. provide flourescent or os in bathroom | $12,000 |
| Oct 26, 2006 | Completed final sign-off Feb 2007 | 3315 Fillmore St | work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent.Details
work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent. | $10,000 |
| Aug 30, 2006 | Completed final sign-off Feb 2007 | 3235 Gough St | for 3235 gough st. #104: turn closet into a full bathroom. open doorways in the interior to the ceiling to create more light and space. build new closet in bedroom 3'x7'Details
for 3235 gough st. #104: turn closet into a full bathroom. open doorways in the interior to the ceiling to create more light and space. build new closet in bedroom 3'x7' | $6,500 |
| Jan 26, 2006 | Never finaled issued Jan 2006, no final | 1819 Hayes St | bathroom remodel - replace window with tempered glass window with same size window in lightwellDetails
bathroom remodel - replace window with tempered glass window with same size window in lightwell | $2,500 |
| Nov 16, 2005 | Completed final sign-off Jan 2006 | 342 Paris St | bathroom remodel,plumbing stays in same position.change window from 30"x44" to 40-1/2"x57-1/2" & will be frame window opening for glass block.new lighting,lighting must be fluorescent or control by occupancy sensor.Details
bathroom remodel,plumbing stays in same position.change window from 30"x44" to 40-1/2"x57-1/2" & will be frame window opening for glass block.new lighting,lighting must be fluorescent or control by occupancy sensor. | $4,500 |
| Feb 25, 2005 | Completed final sign-off Apr 2005 | 354 Bradford St | bathroom remodel - everything stays at same spot except toilet moved over and smallDetails
bathroom remodel - everything stays at same spot except toilet moved over and small | $4,500 |
| Jul 13, 2004 | Completed final sign-off Sep 2004 | 2633 20th St | remodel bath, sink, bathtub, cabinets, tile.Details
remodel bath, sink, bathtub, cabinets, tile. | $4,500 |
| May 25, 2004 | Completed final sign-off Jul 2004 | 380 Bartlett St | remodewl bath- demo, bathrm- shower+tile floor vanity , sink. replace all tile and replace shower *Details
remodewl bath- demo, bathrm- shower+tile floor vanity , sink. replace all tile and replace shower * | $3,500 |
| Jul 23, 2002 | Completed final sign-off Oct 2002 | 1670 24th Av | remodeling & bathroom cut out sheatrock & plumbing fixts.extng rough plumbing will stay.bathrm remodDetails
remodeling & bathroom cut out sheatrock & plumbing fixts.extng rough plumbing will stay.bathrm remod | $15,000 |