T.D. Hurray Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jan 2018
- Last 24 months
- 0 permits filed
32 permits since 2000: 26 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2018 | Never finaled issued Feb 2018, no final | 5553 Diamond Heights Bl | interior remodel of existing family room & utility room, new bathroom at lower level. windows replaced, convert existing family room to master bedroomDetails
interior remodel of existing family room & utility room, new bathroom at lower level. windows replaced, convert existing family room to master bedroom | $44,602 |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 4630 17th St | unit 4630. bath remodel, shower & toilet stay in some spot, (e) double sinks to move over to right a few feet.Details
unit 4630. bath remodel, shower & toilet stay in some spot, (e) double sinks to move over to right a few feet. | $9,037 |
| Feb 3, 2010 | Completed final sign-off Mar 2010 | 121 Lincoln Wy | 1) remodel existing bathroom: sink, tub, and replace (e) shower with toilet. 2) add small sink to (e) water closet. work on unit 121 on second floor. no wall removalDetails
1) remodel existing bathroom: sink, tub, and replace (e) shower with toilet. 2) add small sink to (e) water closet. work on unit 121 on second floor. no wall removal | $10,000 |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 115 Merced Av | 2nd floor bathroom remodel: replace in kind except move non-structural wall back 6" to 8" for plumbing tree. also center lights above tub/frame out 2x6 to move one truss to except new centered lights.Details
2nd floor bathroom remodel: replace in kind except move non-structural wall back 6" to 8" for plumbing tree. also center lights above tub/frame out 2x6 to move one truss to except new centered lights. | $8,250 |
| Oct 28, 2009 | Completed final sign-off Jan 2010 | 56 Elgin Pk | kitchen remodel-change window size to smaller window so countertop won't interfer with window. (window located in the side of the house toward rear).Details
kitchen remodel-change window size to smaller window so countertop won't interfer with window. (window located in the side of the house toward rear). | $5,300 |
| May 19, 2009 | Completed final sign-off Jul 2018 | 439 Corbett Av | car crashed into wall & damaged 50 sq. ft. of wall & windows. replace (e) damage framing & siding, sheet rock & window. repair in kind.Details
car crashed into wall & damaged 50 sq. ft. of wall & windows. replace (e) damage framing & siding, sheet rock & window. repair in kind. | $5,200 |
| Jul 15, 2008 | Completed final sign-off Sep 2008 | 1683 37th Av | remodel full bath. move toilet. add double sink where tub was. no structural work.Details
remodel full bath. move toilet. add double sink where tub was. no structural work. | $6,454 |
| Mar 21, 2008 | Completed final sign-off Jun 2008 | 550 Davis St | kitchen remodel - replace cabinets and apapliances in kind. upgrade electrical plumbing stays in same location, plumbing and electrical under separate permitDetails
kitchen remodel - replace cabinets and apapliances in kind. upgrade electrical plumbing stays in same location, plumbing and electrical under separate permit | $3,500 |
| Oct 15, 2007 | Completed final sign-off May 2008 | 955 Bay St | full bath remodel: demo to bare framing-run new feed lines, new showr pan, tub, toilet & sink, replace in kind with same demensions, tile floors, pan + walls. lighting comply w/title 24.Details
full bath remodel: demo to bare framing-run new feed lines, new showr pan, tub, toilet & sink, replace in kind with same demensions, tile floors, pan + walls. lighting comply w/title 24. | $6,500 |
| Aug 28, 2007 | Completed final sign-off Dec 2007 | 1819 Hayes St | renew pa# 2006/01/26/3119 for final inspection only.Details
renew pa# 2006/01/26/3119 for final inspection only. | |
| Aug 28, 2007 | Completed final sign-off Nov 2007 | 2185 Bush St | full bath remodel:upstairs replace tub, sink ,toilet,. replace exhaust fan and lights and gfi plugs.(basically replace in kind) tile tub around 1/2 bath downstairs. replace toilet, sink and faucet and exhaust fan and light fixtures. provide flourescent or os in bathroomDetails
full bath remodel:upstairs replace tub, sink ,toilet,. replace exhaust fan and lights and gfi plugs.(basically replace in kind) tile tub around 1/2 bath downstairs. replace toilet, sink and faucet and exhaust fan and light fixtures. provide flourescent or os in bathroom | $12,000 |
| May 9, 2007 | Completed final sign-off Jan 2008 | 678 Waller St | kitchen remodel-plumbing stays in same position new elect. take out both pocket door and maek one 48" opening and the other 36" renovation to comply with t-24 energy codes.Details
kitchen remodel-plumbing stays in same position new elect. take out both pocket door and maek one 48" opening and the other 36" renovation to comply with t-24 energy codes. | $6,500 |
| May 4, 2007 | Completed final sign-off Jun 2007 | 3235 Gough St | replace exterior doors to roof in kind with 90min door closing w/closing smoke seal-Details
replace exterior doors to roof in kind with 90min door closing w/closing smoke seal- | $700 |
| Oct 26, 2006 | Completed final sign-off Feb 2007 | 3315 Fillmore St | work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent.Details
work @ unit# 302. bath remodel. plumbing stays in same spot. partial kitchen remodel, change appliances. countertop & sink. wiring room & kitchen to have new recessed lights installed. new lighting to be flourescent. | $10,000 |
| Aug 30, 2006 | Completed final sign-off Feb 2007 | 3235 Gough St | for 3235 gough st. #104: turn closet into a full bathroom. open doorways in the interior to the ceiling to create more light and space. build new closet in bedroom 3'x7'Details
for 3235 gough st. #104: turn closet into a full bathroom. open doorways in the interior to the ceiling to create more light and space. build new closet in bedroom 3'x7' | $6,500 |
| Jan 26, 2006 | Never finaled issued Jan 2006, no final | 1819 Hayes St | bathroom remodel - replace window with tempered glass window with same size window in lightwellDetails
bathroom remodel - replace window with tempered glass window with same size window in lightwell | $2,500 |
| Nov 16, 2005 | Completed final sign-off Jan 2006 | 342 Paris St | bathroom remodel,plumbing stays in same position.change window from 30"x44" to 40-1/2"x57-1/2" & will be frame window opening for glass block.new lighting,lighting must be fluorescent or control by occupancy sensor.Details
bathroom remodel,plumbing stays in same position.change window from 30"x44" to 40-1/2"x57-1/2" & will be frame window opening for glass block.new lighting,lighting must be fluorescent or control by occupancy sensor. | $4,500 |
| Feb 25, 2005 | Completed final sign-off Apr 2005 | 354 Bradford St | bathroom remodel - everything stays at same spot except toilet moved over and smallDetails
bathroom remodel - everything stays at same spot except toilet moved over and small | $4,500 |
| Dec 10, 2004 | Completed final sign-off Jul 2005 | 3521 19th St | kchn remodel/level floor in pantry thus raising door tooDetails
kchn remodel/level floor in pantry thus raising door too | $4,200 |
| Oct 29, 2004 | Completed final sign-off Nov 2004 | 676 Waller St | replace shower pan & tile, fix dry rot, replace shower doorDetails
replace shower pan & tile, fix dry rot, replace shower door | $2,200 |
| Jul 13, 2004 | Completed final sign-off Sep 2004 | 2633 20th St | remodel bath, sink, bathtub, cabinets, tile.Details
remodel bath, sink, bathtub, cabinets, tile. | $4,500 |
| May 25, 2004 | Completed final sign-off Jul 2004 | 380 Bartlett St | remodewl bath- demo, bathrm- shower+tile floor vanity , sink. replace all tile and replace shower *Details
remodewl bath- demo, bathrm- shower+tile floor vanity , sink. replace all tile and replace shower * | $3,500 |
| Sep 22, 2003 | Completed final sign-off Nov 2003 | 178 Alpine Tr | partial remodel:replace tub/shower valve, tear out walls surrounding tub & replace w/sheetrock/tilesDetails
partial remodel:replace tub/shower valve, tear out walls surrounding tub & replace w/sheetrock/tiles | $3,300 |
| Aug 5, 2003 | Completed final sign-off Aug 2003 | 26 Hugo St | replace stairs & landing in kindDetails
replace stairs & landing in kind | $2,100 |
| Aug 4, 2003 | Expired or cancelled cancelled Nov 2024 | 26 Hugo St | repl stairs and landing in kindDetails
repl stairs and landing in kind | $2,100 |
| Jun 16, 2003 | Never finaled issued Jun 2003, no final | 2 Hugo St | rebuilt rear stairs & landing in exact same location & configuration. upgrade guard railsDetails
rebuilt rear stairs & landing in exact same location & configuration. upgrade guard rails | $2,100 |
| Dec 10, 2002 | Completed final sign-off May 2003 | 1670 24th Av | demolish and replace existing exterior wood stairs and landing in kindDetails
demolish and replace existing exterior wood stairs and landing in kind | $1,000 |
| Sep 10, 2002 | Completed final sign-off May 2003 | 1670 24th Av | add 2nd story deck (no stairs), replace (e) deck on side of houseDetails
add 2nd story deck (no stairs), replace (e) deck on side of house | $15,000 |
| Jul 23, 2002 | Completed final sign-off Oct 2002 | 1670 24th Av | dampness problems addition downstairs.tear up plywood flr.reinsulate w/ proper r-valve.add vents inDetails
dampness problems addition downstairs.tear up plywood flr.reinsulate w/ proper r-valve.add vents in | $5,500 |
| Jul 23, 2002 | Completed final sign-off Oct 2002 | 1670 24th Av | remodeling & bathroom cut out sheatrock & plumbing fixts.extng rough plumbing will stay.bathrm remodDetails
remodeling & bathroom cut out sheatrock & plumbing fixts.extng rough plumbing will stay.bathrm remod | $15,000 |
| Jan 29, 2001 | Expired or cancelled expired May 2001 | 85 Carl St | sign permit-non-electric, projecting non illuminated new sign.Details
sign permit-non-electric, projecting non illuminated new sign. | |
| May 17, 2000 | Expired or cancelled expired Sep 2000 | 445 Frederick St | comply with 3r-3070Details
comply with 3r-3070 | $3,344 |