Stroud Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Sep 2026
- Last 24 months
- 5 permits filed
86 permits since 2000: 64 completed, 2 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 1 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2023 | Completed final sign-off Sep 2023 | 46 Marcela Av | revision to permit #202211166687: cladding of front stair walls to be stucco in kind with house. stair treads, risers, and landings to be tile. iron guardrail atop front landing wall to be code height to likeness of front iron balcony.Details
revision to permit #202211166687: cladding of front stair walls to be stucco in kind with house. stair treads, risers, and landings to be tile. iron guardrail atop front landing wall to be code height to likeness of front iron balcony. | |
| Nov 16, 2022 | Completed final sign-off Sep 2023 | 46 Marcela Av | repair leaking stairway and landing at front of house. repair and replace any dryrot in framing in-kind. less than 50%Details
repair leaking stairway and landing at front of house. repair and replace any dryrot in framing in-kind. less than 50% | $23,000 |
| Sep 13, 2021 | Completed final sign-off Jul 2022 | 783 Teresita Bl | to comply w/nov #202051118, repair/replace (e) rear deck, less than 50%, replace waterproof, all framing joists/stairs/framing of stairs to remain, repair/replace (2) sidewalls as needed, new deck covering to replace old.Details
to comply w/nov #202051118, repair/replace (e) rear deck, less than 50%, replace waterproof, all framing joists/stairs/framing of stairs to remain, repair/replace (2) sidewalls as needed, new deck covering to replace old. | $6,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2016 | 101 Pinehurst Wy | remodel existing kitchen; remodel existing bath; remove existing stair and infill opening.Details
remodel existing kitchen; remodel existing bath; remove existing stair and infill opening. | $20,000 |
| Feb 14, 2005 | Completed final sign-off Apr 2005 | 2455 Lake St | rear staircase maintenance/repair. <50 %. to comply with nov 200450041Details
rear staircase maintenance/repair. <50 %. to comply with nov 200450041 | $1,000 |