Back to kitchen remodel contractors
Stroud Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Sep 2026
- Last 24 months
- 5 permits filed
86 permits since 2000: 64 completed, 2 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 11 completed, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2019 | Completed final sign-off Dec 2020 | 494 Fair Oaks St | 1st fl: kitchen remodel work ti include demo and new construction, plumb, lighting, finishes, millwork. laundry relocate washer dryer to garage. new bath in laundry locationDetails
1st fl: kitchen remodel work ti include demo and new construction, plumb, lighting, finishes, millwork. laundry relocate washer dryer to garage. new bath in laundry location | $11,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2019 | 46 Marcela Av | 1st fl: kitchen remodel, new plumbing, lighting, finishes, cabinetry. remove wall between kitchen/dining rm. remodel e bath, add 1 bath, new plumbing, lighting, finishes, millwork. refinish fireplace. 2nd floor: remodel (e) bath in kind. no exterior work. maher not reqDetails
1st fl: kitchen remodel, new plumbing, lighting, finishes, cabinetry. remove wall between kitchen/dining rm. remodel e bath, add 1 bath, new plumbing, lighting, finishes, millwork. refinish fireplace. 2nd floor: remodel (e) bath in kind. no exterior work. maher not req | $120,000 |
| Dec 12, 2017 | Completed final sign-off Aug 2018 | 74 Arroyo Wy | remodel kitchen, replace cabinets, addition new plumbing, lighting, finishes, millwork/cabinetry. basement- legalize media room, bathroom include demo & new construction,plbg,lighting. remodel(e) main & upper baths to include new plumbing, light fixtures, millwork/cabintery. no added square footage.Details
remodel kitchen, replace cabinets, addition new plumbing, lighting, finishes, millwork/cabinetry. basement- legalize media room, bathroom include demo & new construction,plbg,lighting. remodel(e) main & upper baths to include new plumbing, light fixtures, millwork/cabintery. no added square footage. | $150,000 |
| Feb 15, 2017 | Completed final sign-off May 2017 | 35 El Verano Wy | dryrot repair underneath bay windows in breakfast den/kitchen.Details
dryrot repair underneath bay windows in breakfast den/kitchen. | $800 |
| Jan 9, 2017 | Completed final sign-off May 2017 | 35 El Verano Wy | kitchen remodelDetails
kitchen remodel | $34,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2016 | 101 Pinehurst Wy | remodel existing kitchen; remodel existing bath; remove existing stair and infill opening.Details
remodel existing kitchen; remodel existing bath; remove existing stair and infill opening. | $20,000 |
| Apr 2, 2010 | Completed final sign-off Jun 2010 | 1800 17th Av | remodel bathroom (complete fixtures to remain in same location). change cabinetry in kitchen. insulate sheetrock ceilings in bath, livingroom, dining room, bedroom, new lectrical throughout w/ change service, plumbing to replace old fixtures w/ new. south wall at bedroom to have dryrot repairDetails
remodel bathroom (complete fixtures to remain in same location). change cabinetry in kitchen. insulate sheetrock ceilings in bath, livingroom, dining room, bedroom, new lectrical throughout w/ change service, plumbing to replace old fixtures w/ new. south wall at bedroom to have dryrot repair | $55,000 |
| May 25, 2006 | Completed final sign-off Aug 2007 | 125 Laidley St | remodel two dining rooms. replace (e) lighting with new lighting fixtures. move garage disposal to adjacent sink basin in kitchen.Details
remodel two dining rooms. replace (e) lighting with new lighting fixtures. move garage disposal to adjacent sink basin in kitchen. | $50,000 |
| May 22, 2006 | Completed final sign-off Sep 2006 | 763 Ulloa St | kitchen remodel, minunum of 50% of kitchen lighting wattage should be flourescent.Details
kitchen remodel, minunum of 50% of kitchen lighting wattage should be flourescent. | $19,000 |
| May 22, 2006 | Completed final sign-off Jul 2006 | 55 Teresita Bl | kitchen remodel, minunum of 50% of kitchen lighting wattage should be flourescent.Details
kitchen remodel, minunum of 50% of kitchen lighting wattage should be flourescent. | $16,533 |
| Jun 16, 2005 | Completed final sign-off Dec 2005 | 370 Castenada Av | kitchen remodel - no structural changes- plumbing to be re-routed & conform to current codes- elec,Details
kitchen remodel - no structural changes- plumbing to be re-routed & conform to current codes- elec, | $25,000 |
| Jun 15, 2005 | Expired or cancelled expired Jul 2006 | 228 Clayton St | kitchen remodel fixture replacement to remain the same. non structural remodelDetails
kitchen remodel fixture replacement to remain the same. non structural remodel | $12,000 |
| Mar 25, 2005 | Never finaled issued Mar 2005, no final | 228 Clayton St | remodel of kitchen & bathroom (adjacent) for 228 clayton, unit# 1, replace cabinets,Details
remodel of kitchen & bathroom (adjacent) for 228 clayton, unit# 1, replace cabinets, | $20,000 |
| May 27, 2004 | Never finaled issued May 2004, no final | 228 Clayton St | remodel penthouse kitchen/bathroom & general upgrade to standard/sheetrock walls,no structural workDetails
remodel penthouse kitchen/bathroom & general upgrade to standard/sheetrock walls,no structural work | $30,000 |
| Mar 10, 2004 | Expired or cancelled expired Jan 2008 | 230 Clayton St | kitchen & bathroom remodel w/ upgradeed electrical & plumbingDetails
kitchen & bathroom remodel w/ upgradeed electrical & plumbing | $30,000 |
| Mar 10, 2004 | Never finaled issued Mar 2004, no final | 230 Clayton St | kitchen & bathroom remodel w/ upgradeed electrical & plumbingDetails
kitchen & bathroom remodel w/ upgradeed electrical & plumbing | $20,000 |
| Jul 21, 2003 | Expired or cancelled expired May 2004 | 1863 San Jose Av | kitchen remodel no framing changes electrical upgrade as per code plumbing relocation of sink supplyDetails
kitchen remodel no framing changes electrical upgrade as per code plumbing relocation of sink supply | $12,000 |