Back to bathroom remodel contractors
Stroud Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Sep 2026
- Last 24 months
- 5 permits filed
86 permits since 2000: 64 completed, 2 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 21 completed, 5 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2022 | Completed final sign-off Mar 2022 | 420 Franconia St | upstairs bathroom remodel. existing tub to become shower, change existing toilet, vanity, and skylight.Details
upstairs bathroom remodel. existing tub to become shower, change existing toilet, vanity, and skylight. | $26,000 |
| Aug 31, 2020 | Expired or cancelled expired Jul 2022 | 783 Teresita Bl | ground floor renovation including one bedroom, one full bath and recreation room.Details
ground floor renovation including one bedroom, one full bath and recreation room. | $85,000 |
| Nov 27, 2019 | Completed final sign-off Dec 2020 | 494 Fair Oaks St | 1st fl: kitchen remodel work ti include demo and new construction, plumb, lighting, finishes, millwork. laundry relocate washer dryer to garage. new bath in laundry locationDetails
1st fl: kitchen remodel work ti include demo and new construction, plumb, lighting, finishes, millwork. laundry relocate washer dryer to garage. new bath in laundry location | $11,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2019 | 46 Marcela Av | 1st fl: kitchen remodel, new plumbing, lighting, finishes, cabinetry. remove wall between kitchen/dining rm. remodel e bath, add 1 bath, new plumbing, lighting, finishes, millwork. refinish fireplace. 2nd floor: remodel (e) bath in kind. no exterior work. maher not reqDetails
1st fl: kitchen remodel, new plumbing, lighting, finishes, cabinetry. remove wall between kitchen/dining rm. remodel e bath, add 1 bath, new plumbing, lighting, finishes, millwork. refinish fireplace. 2nd floor: remodel (e) bath in kind. no exterior work. maher not req | $120,000 |
| Dec 12, 2017 | Completed final sign-off Aug 2018 | 74 Arroyo Wy | remodel kitchen, replace cabinets, addition new plumbing, lighting, finishes, millwork/cabinetry. basement- legalize media room, bathroom include demo & new construction,plbg,lighting. remodel(e) main & upper baths to include new plumbing, light fixtures, millwork/cabintery. no added square footage.Details
remodel kitchen, replace cabinets, addition new plumbing, lighting, finishes, millwork/cabinetry. basement- legalize media room, bathroom include demo & new construction,plbg,lighting. remodel(e) main & upper baths to include new plumbing, light fixtures, millwork/cabintery. no added square footage. | $150,000 |
| Oct 18, 2017 | Completed final sign-off May 2018 | 309 Surrey St | remodel 2 bathrooms to include demo of non-structural wall & new construction of interior partitions, new plumbing fixtures, lighting, finishes and millwork.Details
remodel 2 bathrooms to include demo of non-structural wall & new construction of interior partitions, new plumbing fixtures, lighting, finishes and millwork. | $6,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 52 Martha Av | middle level full bathroom remodel.Details
middle level full bathroom remodel. | $25,000 |
| Apr 6, 2016 | Completed final sign-off Aug 2016 | 782 16th Av | new bathroom on 3rd floor in master bedroom. remodel extg bathroom on 3rd floor to become a laundry room. all changes within extg envelope. no new windows.Details
new bathroom on 3rd floor in master bedroom. remodel extg bathroom on 3rd floor to become a laundry room. all changes within extg envelope. no new windows. | $45,000 |
| Jun 9, 2015 | Completed final sign-off Aug 2015 | 1800 17th Av | master bathroom remodel on upper unit.Details
master bathroom remodel on upper unit. | $23,000 |
| Apr 17, 2015 | Completed final sign-off Aug 2015 | 101 Pinehurst Wy | remodel bathroom @ 2nd floorDetails
remodel bathroom @ 2nd floor | $20,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2016 | 101 Pinehurst Wy | remodel existing kitchen; remodel existing bath; remove existing stair and infill opening.Details
remodel existing kitchen; remodel existing bath; remove existing stair and infill opening. | $20,000 |
| Mar 25, 2014 | Completed final sign-off Jun 2014 | 2249 Cayuga Av | bathroom remodel, existing tub remains, new electric (gfi), toilet & vanity to be replaced with new in same location, new tile on floor only, new fan.Details
bathroom remodel, existing tub remains, new electric (gfi), toilet & vanity to be replaced with new in same location, new tile on floor only, new fan. | $15,000 |
| Apr 2, 2010 | Completed final sign-off Jun 2010 | 1800 17th Av | remodel bathroom (complete fixtures to remain in same location). change cabinetry in kitchen. insulate sheetrock ceilings in bath, livingroom, dining room, bedroom, new lectrical throughout w/ change service, plumbing to replace old fixtures w/ new. south wall at bedroom to have dryrot repairDetails
remodel bathroom (complete fixtures to remain in same location). change cabinetry in kitchen. insulate sheetrock ceilings in bath, livingroom, dining room, bedroom, new lectrical throughout w/ change service, plumbing to replace old fixtures w/ new. south wall at bedroom to have dryrot repair | $55,000 |
| Jan 7, 2008 | Completed final sign-off Feb 2008 | 431 Paris St | remodel 1 bathroom, lower floor, gfci at basin, motion sensor, all fixtures to remain in same location. new shower pan, tile, walls & ceiling to remain intfact. paintDetails
remodel 1 bathroom, lower floor, gfci at basin, motion sensor, all fixtures to remain in same location. new shower pan, tile, walls & ceiling to remain intfact. paint | $10,000 |
| Sep 18, 2007 | Expired or cancelled expired Feb 2012 | 737 Lakeview Av | bathroom remodel-no structural . elec. + plumbing to be done by others.Details
bathroom remodel-no structural . elec. + plumbing to be done by others. | $12,000 |
| May 17, 2007 | Never finaled issued May 2007, no final | 687 University St | revise 200611178037 at request of field inspector. legalize 1 bedroom and 1 bath at ground level. bolt e mudsill with 5/8 bolts. epoxy 1 min 7 in embedment 4' o/c max. n plywood panels at garage level at rear wall around garage door and entry wallDetails
revise 200611178037 at request of field inspector. legalize 1 bedroom and 1 bath at ground level. bolt e mudsill with 5/8 bolts. epoxy 1 min 7 in embedment 4' o/c max. n plywood panels at garage level at rear wall around garage door and entry wall | |
| Feb 2, 2007 | Completed final sign-off Aug 2007 | 370 Castenada Av | bathroom remodel, master bath and guest bath. upper floor. no structural work. no new windows, upgrade fixtures, and retile. elec brought up to code. comply with title 24 motion sensorDetails
bathroom remodel, master bath and guest bath. upper floor. no structural work. no new windows, upgrade fixtures, and retile. elec brought up to code. comply with title 24 motion sensor | $20,000 |
| Nov 17, 2006 | Never finaled issued Nov 2006, no final | 687 University St | house remodel kitche, two bathrooms, living room, three bedrooms, flourescent lighting.Details
house remodel kitche, two bathrooms, living room, three bedrooms, flourescent lighting. | $60,000 |
| Aug 22, 2006 | Completed final sign-off Aug 2007 | 125 Laidley St | bath remodel top floor and bottom floor. 2 upstairs bedrooms, top floor, rating wall/remove plaster &new lighting. laundry room remodel, lower floor. bath lights to be on occupancy sensor or flourecent bedroom to be on dimmor or flourecent lightingDetails
bath remodel top floor and bottom floor. 2 upstairs bedrooms, top floor, rating wall/remove plaster &new lighting. laundry room remodel, lower floor. bath lights to be on occupancy sensor or flourecent bedroom to be on dimmor or flourecent lighting | $60,000 |
| Aug 22, 2006 | Completed final sign-off Nov 2006 | 370 Castenada Av | 1 bathroom remodel. no structural framing necessary. plumbing and elec to comply with code. no new light fixtures.Details
1 bathroom remodel. no structural framing necessary. plumbing and elec to comply with code. no new light fixtures. | $15,000 |
| Mar 25, 2005 | Never finaled issued Mar 2005, no final | 228 Clayton St | remodel of kitchen & bathroom (adjacent) for 228 clayton, unit# 1, replace cabinets,Details
remodel of kitchen & bathroom (adjacent) for 228 clayton, unit# 1, replace cabinets, | $20,000 |
| Aug 31, 2004 | Completed final sign-off Nov 2004 | 584 29th St | upstairs bathroom remodel. reroute (e) plumbing for tub, reroute (e) plumbing for sink.Details
upstairs bathroom remodel. reroute (e) plumbing for tub, reroute (e) plumbing for sink. | $17,000 |
| Jun 30, 2004 | Completed final sign-off Dec 2004 | 1865 California St | bathroom remodel- bring electrical & plumbing up to code. relocating vanity to adj wall, no change iDetails
bathroom remodel- bring electrical & plumbing up to code. relocating vanity to adj wall, no change i | $17,000 |
| Jun 14, 2004 | Completed final sign-off Sep 2004 | 1595 11th Av | remodel bath-replace all fixtures possition in exist location.add gfci protected outlet&bring tocodeDetails
remodel bath-replace all fixtures possition in exist location.add gfci protected outlet&bring tocode | $15,000 |
| May 27, 2004 | Never finaled issued May 2004, no final | 228 Clayton St | remodel penthouse kitchen/bathroom & general upgrade to standard/sheetrock walls,no structural workDetails
remodel penthouse kitchen/bathroom & general upgrade to standard/sheetrock walls,no structural work | $30,000 |
| Apr 30, 2004 | Expired or cancelled expired Apr 2005 | 228 Clayton St | bathroom remodel, replace (e) tub, replace sink, replace toilet, tile wallDetails
bathroom remodel, replace (e) tub, replace sink, replace toilet, tile wall | $12,000 |
| Mar 10, 2004 | Expired or cancelled expired Jan 2008 | 230 Clayton St | kitchen & bathroom remodel w/ upgradeed electrical & plumbingDetails
kitchen & bathroom remodel w/ upgradeed electrical & plumbing | $30,000 |
| Mar 10, 2004 | Never finaled issued Mar 2004, no final | 230 Clayton St | kitchen & bathroom remodel w/ upgradeed electrical & plumbingDetails
kitchen & bathroom remodel w/ upgradeed electrical & plumbing | $20,000 |
| Feb 11, 2004 | Completed final sign-off Mar 2004 | 33 Henry St | remodel 2/f bathroomDetails
remodel 2/f bathroom | $12,000 |
| Apr 2, 2003 | Completed final sign-off May 2003 | 870 Junipero Serra Bl | bathroom remodel. all fixtures to remain at same location. replace tile and upgrade electrical.Details
bathroom remodel. all fixtures to remain at same location. replace tile and upgrade electrical. | $12,000 |