Streamlined Building Inc
- Based in
- Menlo Park
- On San Francisco permits
- May 2018 to Mar 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 42 days from filing to permit and 343 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2021 | Completed final sign-off Jan 2023 | 226 20th Av | relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f.Details
relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f. | $100,000 |