Back to bathroom remodel contractors
Streamlined Building Inc
- Based in
- Menlo Park
- On San Francisco permits
- May 2018 to Mar 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 44 days from filing to permit and 726 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2022 | Completed final sign-off Feb 2024 | 2754 Bush St | upgrade the foundation. excavate the space behind the garage on 1/f. replace windows on each floor. upgrade mech. elect, and plumbing for each unit. remove exterior siding. relocate & remodel (e) kitchen, (e) dining and (e) bathroom in each unit (rev to pa202201186181).Details
upgrade the foundation. excavate the space behind the garage on 1/f. replace windows on each floor. upgrade mech. elect, and plumbing for each unit. remove exterior siding. relocate & remodel (e) kitchen, (e) dining and (e) bathroom in each unit (rev to pa202201186181). | $100,000 |
| Jan 18, 2022 | Completed final sign-off Feb 2024 | 2754 Bush St | remodel (e) bathroom on 1/f & 2/f for 2754-2756 bush st. no change to layout or demo of walls. electrical upgrade to all level w/ h.e. lights. remove (e) wall & ceiling plaster for electrical upgrade and installation. to comply with current engery/electrical codes. patch ceiling/walls.Details
remodel (e) bathroom on 1/f & 2/f for 2754-2756 bush st. no change to layout or demo of walls. electrical upgrade to all level w/ h.e. lights. remove (e) wall & ceiling plaster for electrical upgrade and installation. to comply with current engery/electrical codes. patch ceiling/walls. | $50,000 |
| Dec 17, 2021 | Completed final sign-off Jan 2023 | 226 20th Av | relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f.Details
relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f. | $100,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 270 Ellsworth St | add new guest room and remodel bathroom on 1st floor per plan. reconfigure bathroom and relocate laundry room on 2nd floor. repair/replace extg retaining wall at rear yard.Details
add new guest room and remodel bathroom on 1st floor per plan. reconfigure bathroom and relocate laundry room on 2nd floor. repair/replace extg retaining wall at rear yard. | $22,000 |