Back to kitchen remodel contractors
Streamlined Building Inc
- Based in
- Menlo Park
- On San Francisco permits
- May 2018 to Mar 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 52 days from filing to permit and 403 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2022 | Completed final sign-off Feb 2023 | 1 Hawthorne St | kitchnen cabinet replacement. in-kindkitchen remodel. new appliances and countertop tile and fixtures.Details
kitchnen cabinet replacement. in-kindkitchen remodel. new appliances and countertop tile and fixtures. | $10,000 |
| Aug 3, 2022 | Completed final sign-off Feb 2024 | 2754 Bush St | infill the rear section on g/f. remodel the kitchen and living room on 3/f per plan. replace the rear facing window material per plan.Details
infill the rear section on g/f. remodel the kitchen and living room on 3/f per plan. replace the rear facing window material per plan. | $25,000 |
| Feb 18, 2022 | Completed final sign-off Feb 2024 | 2754 Bush St | upgrade the foundation. excavate the space behind the garage on 1/f. replace windows on each floor. upgrade mech. elect, and plumbing for each unit. remove exterior siding. relocate & remodel (e) kitchen, (e) dining and (e) bathroom in each unit (rev to pa202201186181).Details
upgrade the foundation. excavate the space behind the garage on 1/f. replace windows on each floor. upgrade mech. elect, and plumbing for each unit. remove exterior siding. relocate & remodel (e) kitchen, (e) dining and (e) bathroom in each unit (rev to pa202201186181). | $100,000 |
| Dec 17, 2021 | Completed final sign-off Jan 2023 | 226 20th Av | relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f.Details
relocate luandry from 2/f to 1/f.reconfig staircase btw 1/2f.reduce (e) powder room & add (n) pantry on 2/f. remodel (e) kitchen w/ open designs on 2/f. convert (e) w/c to full on 3/f.reconfig (e) bath into (n) masterbath on 3/f. | $100,000 |