Back to kitchen remodel contractors
Stone Ink Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Dec 2020
- Last 24 months
- 0 permits filed
62 permits since 2000: 41 completed, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 3 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 6 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2016 | Completed final sign-off Nov 2016 | 2078 Hayes St | previous restauran removed their equipment. we will install 3 compartment sink, mop sink, hand sink and prep sink. the ceiling will be lowered in the kitchen. type 1 hood will be installed using the (e) permitted ventilation system. ansul under separate permit.Details
previous restauran removed their equipment. we will install 3 compartment sink, mop sink, hand sink and prep sink. the ceiling will be lowered in the kitchen. type 1 hood will be installed using the (e) permitted ventilation system. ansul under separate permit. | $55,000 |
| Jun 3, 2014 | Completed final sign-off Dec 2020 | 1333 Jones St | #509- kitchen remodel - w/ (e) cabinets, (n) counters, (e) switches & recpticales, (n) light soffit; bathroom - replace ceiling fan & remove tub & replace w/ (n) shower only ; to comply with cec150(k) 8 & 10. n/a ordinance #155-13Details
#509- kitchen remodel - w/ (e) cabinets, (n) counters, (e) switches & recpticales, (n) light soffit; bathroom - replace ceiling fan & remove tub & replace w/ (n) shower only ; to comply with cec150(k) 8 & 10. n/a ordinance #155-13 | $12,000 |
| Jan 26, 2011 | Completed final sign-off Apr 2011 | 2200 Sacramento St | (1) kitchen remodel -demo old cabinets / elect as needed/ plumbing as needed - repair and replace sheet rock and install new cabinets; provide h.e. light (min. 50% wattage in h.e. light)Details
(1) kitchen remodel -demo old cabinets / elect as needed/ plumbing as needed - repair and replace sheet rock and install new cabinets; provide h.e. light (min. 50% wattage in h.e. light) | $20,000 |
| Dec 5, 2008 | Completed final sign-off May 2009 | 3476 22nd St | condo conversion compliance work; patch sheetrock as needed for plumbing access and electrical access, 3r-5095. due to kitchen remodel in both units. unit 3476 add washer/dryer vent.Details
condo conversion compliance work; patch sheetrock as needed for plumbing access and electrical access, 3r-5095. due to kitchen remodel in both units. unit 3476 add washer/dryer vent. | $4,500 |
| Nov 14, 2006 | Expired or cancelled expired Jan 2010 | 154 Everson St | kitchen remodel, removel wall @ kitchen/dinning, new kitchen, relocate heater & water heatr, new lighting on 2nd floorDetails
kitchen remodel, removel wall @ kitchen/dinning, new kitchen, relocate heater & water heatr, new lighting on 2nd floor | $70,000 |
| Jun 25, 2003 | Expired or cancelled expired Sep 2005 | 2100 Green St | kitchen remodel. no structural changes. no changes to window.Details
kitchen remodel. no structural changes. no changes to window. | $40,000 |
| Feb 11, 2003 | Completed final sign-off May 2003 | 270 Ashton Av | kitchen cabinet repair/replacement, patch ceiling, patch title, new counters, new lightingDetails
kitchen cabinet repair/replacement, patch ceiling, patch title, new counters, new lighting | $20,000 |
| May 23, 2002 | Never finaled issued May 2002, no final | 1355 Oak St | remove replace kitchen cabs call locations to remain same add of dish washer remove replace tubDetails
remove replace kitchen cabs call locations to remain same add of dish washer remove replace tub | $8,000 |
| Dec 6, 2001 | Completed final sign-off Apr 2002 | 1250 Clay St | removal and replacement of kitchen cabinets no structural changesDetails
removal and replacement of kitchen cabinets no structural changes | $1,500 |