Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2025 | In progress issued Dec 2025 | 154 Cole St | installation of stair handrails in back stairwell, not visible from street. 80 linear feet. to comply with nov#202546803 item #2Details
installation of stair handrails in back stairwell, not visible from street. 80 linear feet. to comply with nov#202546803 item #2 | $350 | |
| Dec 9, 2019 | Completed final sign-off Nov 2020 | 154 Cole St | Morena Llc /Dba: Tony's Windows & Glass | unit # 9: in-kind window replacement of 8 double hung windows, (n) windows will be wood to match (e) size and locationDetails
unit # 9: in-kind window replacement of 8 double hung windows, (n) windows will be wood to match (e) size and location | $8,085 |
| Feb 21, 2018 | Completed final sign-off Feb 2018 | 154 Cole St | K Lui General Construction Co. | revision to 201401236911, soft story retrofit per sfbc ch 4d national design method. clarify scope of work, building inrormation, applicable codes and drawing index as shown on a-1Details
revision to 201401236911, soft story retrofit per sfbc ch 4d national design method. clarify scope of work, building inrormation, applicable codes and drawing index as shown on a-1 | |
| Sep 19, 2017 | Never finaled issued Sep 2017, no final | 154 Cole St | Morena Llc /Dba: Tony's Windows & Glass | replace wood windows with vinyl upgrade cannot be seen from street. bedroom egress conforming, 3 at bedroom 1, 3 bedroom 2, 3 living rm, 1 kitchen, 1 dining rmDetails
replace wood windows with vinyl upgrade cannot be seen from street. bedroom egress conforming, 3 at bedroom 1, 3 bedroom 2, 3 living rm, 1 kitchen, 1 dining rm | $7,150 |
| Oct 31, 2016 | Completed final sign-off Nov 2016 | 2078 Hayes St | Coastside Fire Lprotection | the kitchen hood is reconnected to the ventilation system after the ceiling is lowered. fire suppression system is actiivated. no visible work from street.Details
the kitchen hood is reconnected to the ventilation system after the ceiling is lowered. fire suppression system is actiivated. no visible work from street. | $2,000 |
| May 19, 2016 | Completed final sign-off Nov 2016 | 2078 Hayes St | Stone Ink Construction | previous restauran removed their equipment. we will install 3 compartment sink, mop sink, hand sink and prep sink. the ceiling will be lowered in the kitchen. type 1 hood will be installed using the (e) permitted ventilation system. ansul under separate permit.Details
previous restauran removed their equipment. we will install 3 compartment sink, mop sink, hand sink and prep sink. the ceiling will be lowered in the kitchen. type 1 hood will be installed using the (e) permitted ventilation system. ansul under separate permit. | $55,000 |
| Apr 11, 2014 | Never finaled issued Apr 2014, no final | 154 Cole St | street spaceDetails
street space | ||
| Feb 24, 2014 | Completed final sign-off May 2014 | 154 Cole St | K Lui General Construction Co. | revision to pa 201401236911 to clarify the powered door operator control is to be mounted between 36" and 44" above teh finished floor with 30" x 48" adjacent clear floor verify in field existing slope at door not exceeding 1:12Details
revision to pa 201401236911 to clarify the powered door operator control is to be mounted between 36" and 44" above teh finished floor with 30" x 48" adjacent clear floor verify in field existing slope at door not exceeding 1:12 | |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 154 Cole St | street spaceDetails
street space | ||
| Jan 23, 2014 | Completed final sign-off May 2014 | 154 Cole St | K Lui General Construction Co. | seismic upgrade. of first floor. ada door on separate permit. jjcDetails
seismic upgrade. of first floor. ada door on separate permit. jjc | $18,000 |
| Jan 7, 2010 | Completed final sign-off Jan 2010 | 2078 Hayes St | H K Fire Protection Inc.* Check I.D. *** | upgrade automatic fire suppression system for kitchen exhaust hood.Details
upgrade automatic fire suppression system for kitchen exhaust hood. | $4,000 |
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 154 Cole St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K Lui General Construction Co. (3), Morena Llc /Dba: Tony's Windows & Glass (2), Coastside Fire Lprotection, H K Fire Protection Inc.* Check I.D. ***, Stone Ink Construction
- Engineers
- David Hung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.