Back to bathroom remodel contractors
Stone Ink Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Dec 2020
- Last 24 months
- 0 permits filed
62 permits since 2000: 41 completed, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 3 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2020 | Completed final sign-off Jul 2021 | 179 West Portal Av | to comply with nov # 202051711; (n) non-load bearing walls, (n) ada compliant gender neutral bathroom, (n) lighting throughout, (n) flooring, paint, & finishes throughout. (e) mezzanine & employee bathroom to remain.Details
to comply with nov # 202051711; (n) non-load bearing walls, (n) ada compliant gender neutral bathroom, (n) lighting throughout, (n) flooring, paint, & finishes throughout. (e) mezzanine & employee bathroom to remain. | $200,000 |
| Aug 2, 2019 | Never finaled issued Feb 2020, no final | 1671 York St | unit legalization ordinance# 43-14, legalize (e) unit. 2 bedrooms & 1 bath, add 1 closet near entry. move 1 bedroom door. add windows:1 bedroom, 1 dining. add doors: replace (e) entry door. add patio doors.Details
unit legalization ordinance# 43-14, legalize (e) unit. 2 bedrooms & 1 bath, add 1 closet near entry. move 1 bedroom door. add windows:1 bedroom, 1 dining. add doors: replace (e) entry door. add patio doors. | $15,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 121 Juanita Wy | bathroom remodel: relocate toilet, vanit, shower. tile floor & shower., new lighting. no walls to be altered.Details
bathroom remodel: relocate toilet, vanit, shower. tile floor & shower., new lighting. no walls to be altered. | $12,000 |
| Feb 23, 2015 | Completed final sign-off Nov 2015 | 2200 Sacramento St | unit 102 - bathroom remodel - vanity, remove and replace shower tile floor ; to comply with cec150.0(k)5; maher n/aDetails
unit 102 - bathroom remodel - vanity, remove and replace shower tile floor ; to comply with cec150.0(k)5; maher n/a | $4,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2015 | 1627 18th Av | add new bathroom w/shower, new storage & relocate laundry. all work on ground floor.Details
add new bathroom w/shower, new storage & relocate laundry. all work on ground floor. | $12,000 |
| Jun 3, 2014 | Completed final sign-off Dec 2020 | 1333 Jones St | #509- kitchen remodel - w/ (e) cabinets, (n) counters, (e) switches & recpticales, (n) light soffit; bathroom - replace ceiling fan & remove tub & replace w/ (n) shower only ; to comply with cec150(k) 8 & 10. n/a ordinance #155-13Details
#509- kitchen remodel - w/ (e) cabinets, (n) counters, (e) switches & recpticales, (n) light soffit; bathroom - replace ceiling fan & remove tub & replace w/ (n) shower only ; to comply with cec150(k) 8 & 10. n/a ordinance #155-13 | $12,000 |
| Jul 10, 2012 | Completed final sign-off Jan 2013 | 2361 Jackson St | kitch & bath rm. remodel; remove & replace existing cabinets, tub/shower w/ new cabinets in same locations. no relocation.Details
kitch & bath rm. remodel; remove & replace existing cabinets, tub/shower w/ new cabinets in same locations. no relocation. | $7,000 |
| Mar 19, 2009 | Completed final sign-off Nov 2009 | 3071 California St | reconfire rooms on 2nd floor to add new master bath, closet, and fireplace in existing space on 2nd floor.Details
reconfire rooms on 2nd floor to add new master bath, closet, and fireplace in existing space on 2nd floor. | $10,000 |
| Sep 29, 2005 | Expired or cancelled expired Oct 2008 | 3069 California St | add mste bathroom with shower tub toilet bidee sink utility closet with laundry mstr closet on the 3/f this is a revision to appln #2005/09/16/3129Details
add mste bathroom with shower tub toilet bidee sink utility closet with laundry mstr closet on the 3/f this is a revision to appln #2005/09/16/3129 | $15,000 |
| May 18, 2005 | Completed final sign-off Aug 2005 | 353 Molimo Dr | bathroom remodel- repair/replace remove shower new shower/tub, pocket for vanity, (1) new window inDetails
bathroom remodel- repair/replace remove shower new shower/tub, pocket for vanity, (1) new window in | $5,000 |