Stokely Marcus Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Dec 2021
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 13 days from filing to permit and 543 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2016 | Completed final sign-off Sep 2019 | 112 Woodland Av | condition basement & sub basement, remodel 1st & 2nd floor per plans. replace wind0w(s) & door(s) on side & rear of property. new interior stair(s) connecting all flo9ors, new elevator & new roof deck. infill half of existing light well.Details
condition basement & sub basement, remodel 1st & 2nd floor per plans. replace wind0w(s) & door(s) on side & rear of property. new interior stair(s) connecting all flo9ors, new elevator & new roof deck. infill half of existing light well. | $150,000 |
| Jul 18, 2016 | Never finaled filed Jul 2016, never issued | 130 11th Av | horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughoutDetails
horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughout | $700,000 |
| Jun 17, 2016 | Completed final sign-off Sep 2017 | 18 Prospect Av | voluntary structural strengthening. repair with right side stair from 1st floor to sub basement. remodel basement level. new glass sliding door on sub basement level. add 2 new dormers. convert sub-basement into garage. (n) lightwell w/egress ladderDetails
voluntary structural strengthening. repair with right side stair from 1st floor to sub basement. remodel basement level. new glass sliding door on sub basement level. add 2 new dormers. convert sub-basement into garage. (n) lightwell w/egress ladder | $50,000 |
| Mar 23, 2016 | Completed final sign-off Sep 2017 | 18 Prospect Av | voluntary structural strengthening. new stairs from sub-basement to 1st floor. remodel basement, 1st, 2nd & 3rd floor. new patio door & deck @ basement level. change basment layout and add 1.2 bath and 2 bedrooms.Details
voluntary structural strengthening. new stairs from sub-basement to 1st floor. remodel basement, 1st, 2nd & 3rd floor. new patio door & deck @ basement level. change basment layout and add 1.2 bath and 2 bedrooms. | $100,000 |