Back to kitchen remodel contractors
Stokely Marcus Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Dec 2021
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 1 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 1033 Washington St | unit 1033: replace sink, counter top, back splash in kitchen. replace toilet and vanity in (2) bathrooms. unit 1035: replace sink, countertop, back splash in kitchen. replace toilet and vanity in (2) bath rooms. unit 1037: replace sink, counter top, back splash in kitchen. replace toilet and vanityDetails
unit 1033: replace sink, counter top, back splash in kitchen. replace toilet and vanity in (2) bathrooms. unit 1035: replace sink, countertop, back splash in kitchen. replace toilet and vanity in (2) bath rooms. unit 1037: replace sink, counter top, back splash in kitchen. replace toilet and vanity | $45,000 |
| Jul 18, 2016 | Never finaled filed Jul 2016, never issued | 130 11th Av | horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughoutDetails
horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughout | $700,000 |
| Mar 7, 2016 | Completed final sign-off Sep 2016 | 130 11th Av | remodel kitchen at 2nd floor. split bathroom at 3rd floor. remove wall between dining room & kitchen @ 2nd floor. add storage room at 1st floor. replace (e) fireplace with (n) gas fire place.Details
remodel kitchen at 2nd floor. split bathroom at 3rd floor. remove wall between dining room & kitchen @ 2nd floor. add storage room at 1st floor. replace (e) fireplace with (n) gas fire place. | $30,000 |