Stokely Marcus Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Dec 2021
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 1033 Washington St | unit 1033: replace sink, counter top, back splash in kitchen. replace toilet and vanity in (2) bathrooms. unit 1035: replace sink, countertop, back splash in kitchen. replace toilet and vanity in (2) bath rooms. unit 1037: replace sink, counter top, back splash in kitchen. replace toilet and vanityDetails
unit 1033: replace sink, counter top, back splash in kitchen. replace toilet and vanity in (2) bathrooms. unit 1035: replace sink, countertop, back splash in kitchen. replace toilet and vanity in (2) bath rooms. unit 1037: replace sink, counter top, back splash in kitchen. replace toilet and vanity | $45,000 |
| Nov 22, 2021 | Completed final sign-off Sep 2022 | 3490 20th St | revision to pa 2016-0412-4497 revised interior configuration per plan.Details
revision to pa 2016-0412-4497 revised interior configuration per plan. | |
| Jan 8, 2021 | Completed final sign-off Jul 2021 | 1392 07th Av | remodel (2) bathrooms on 2nd & 3rd fl; replace tub, toilet & vanity at (e) location. no change to wall & opening layoutDetails
remodel (2) bathrooms on 2nd & 3rd fl; replace tub, toilet & vanity at (e) location. no change to wall & opening layout | $28,000 |
| Nov 17, 2020 | Completed final sign-off Jul 2021 | 1392 07th Av | convert storage to wine cellar at basement. convert full bathroom to 1/2 bath and g/f. relocate master bath & remodel (e) office on 3/f.Details
convert storage to wine cellar at basement. convert full bathroom to 1/2 bath and g/f. relocate master bath & remodel (e) office on 3/f. | $43,000 |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 3490 20th St | street spaceDetails
street space | |
| Nov 8, 2019 | Completed final sign-off Sep 2022 | 3488 20th St | administrative permit for permit application 201906123255. for administrative purpose only: ti cgabge address on this permit from 3490 20th st to 3488 20th stDetails
administrative permit for permit application 201906123255. for administrative purpose only: ti cgabge address on this permit from 3490 20th st to 3488 20th st | |
| Jun 12, 2019 | Completed final sign-off Sep 2022 | 3490 20th St | t.i. for 985 sq ft, no structural for (e) health services. new finishes. ada restroom.Details
t.i. for 985 sq ft, no structural for (e) health services. new finishes. ada restroom. | $30,000 |
| Apr 1, 2019 | Completed final sign-off Sep 2022 | 3490 20th St | installation and shoring sequence for previously approved foundation upgrade under app#201604124497Details
installation and shoring sequence for previously approved foundation upgrade under app#201604124497 | $20,000 |
| Jan 7, 2019 | Completed final sign-off Sep 2019 | 112 Woodland Av | recommencement and completion work approved under pa 2016-0901-6549 & 2017-0119-7507Details
recommencement and completion work approved under pa 2016-0901-6549 & 2017-0119-7507 | $3,000 |
| Dec 14, 2018 | Completed final sign-off Sep 2019 | 112 Woodland Av | recommencement and completion of work approved under pa# 201604013715, 201605258377 and 201608185417Details
recommencement and completion of work approved under pa# 201604013715, 201605258377 and 201608185417 | $60,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2019 | 112 Woodland Av | to comply with nov# 201723131. basemet:nw walls to create nw office & hall. removal of cabinet & counter for nw closet. 1st floor: removal of balcony, 2 nw water heater & dr. relocation of sink. 2nd flr: removal of 2x lin with relocatn of dr. additn of shower. 3rd flr:remove wine storag/ fire placeDetails
to comply with nov# 201723131. basemet:nw walls to create nw office & hall. removal of cabinet & counter for nw closet. 1st floor: removal of balcony, 2 nw water heater & dr. relocation of sink. 2nd flr: removal of 2x lin with relocatn of dr. additn of shower. 3rd flr:remove wine storag/ fire place | $10,000 |
| Aug 16, 2017 | Completed final sign-off Sep 2017 | 18 Prospect Av | change to interior layout: basement - reconfigure fixture in master bath. 1st floor - remove interior partition between dining room & front entry. remove storage closet & enlarge family room. attic: down size storage closet & enlarge catwalk.Details
change to interior layout: basement - reconfigure fixture in master bath. 1st floor - remove interior partition between dining room & front entry. remove storage closet & enlarge family room. attic: down size storage closet & enlarge catwalk. | $15,000 |
| Jan 25, 2017 | Completed final sign-off Sep 2017 | 18 Prospect Av | change to front facade.Details
change to front facade. | $30,000 |
| Nov 2, 2016 | Completed final sign-off Sep 2019 | 112 Woodland Av | reconfigure & enlarge light court on the west side of building. expand (e) roof deck (approved under separate permit); infill lightwell.Details
reconfigure & enlarge light court on the west side of building. expand (e) roof deck (approved under separate permit); infill lightwell. | $15,000 |
| Sep 1, 2016 | Expired or cancelled expired Sep 2019 | 112 Woodland Av | vistibule added at new front door, new window on front facade.Details
vistibule added at new front door, new window on front facade. | $3,000 |
| Aug 18, 2016 | Expired or cancelled expired Sep 2019 | 112 Woodland Av | revision to ref pa 201605258377 cap portion of (e) foundation as indicated on plan, instead replacingDetails
revision to ref pa 201605258377 cap portion of (e) foundation as indicated on plan, instead replacing | |
| Aug 15, 2016 | Completed final sign-off Sep 2019 | 112 Woodland Av | condition basement & sub basement, remodel 1st & 2nd floor per plans. replace wind0w(s) & door(s) on side & rear of property. new interior stair(s) connecting all flo9ors, new elevator & new roof deck. infill half of existing light well.Details
condition basement & sub basement, remodel 1st & 2nd floor per plans. replace wind0w(s) & door(s) on side & rear of property. new interior stair(s) connecting all flo9ors, new elevator & new roof deck. infill half of existing light well. | $150,000 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 118 Woodland Av | repair and replace 5'6 section of concrete foundation at existing locationDetails
repair and replace 5'6 section of concrete foundation at existing location | |
| Jul 18, 2016 | Never finaled filed Jul 2016, never issued | 130 11th Av | horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughoutDetails
horizontal & vertical addition. add 3 bathrooms, 2 bedrooms,office & media room, kitchen, reconfigure stairs & complete interior remodel. no change to facade windows under this permit.sprinkler 13r throughout | $700,000 |
| Jun 17, 2016 | Completed final sign-off Sep 2017 | 18 Prospect Av | voluntary structural strengthening. repair with right side stair from 1st floor to sub basement. remodel basement level. new glass sliding door on sub basement level. add 2 new dormers. convert sub-basement into garage. (n) lightwell w/egress ladderDetails
voluntary structural strengthening. repair with right side stair from 1st floor to sub basement. remodel basement level. new glass sliding door on sub basement level. add 2 new dormers. convert sub-basement into garage. (n) lightwell w/egress ladder | $50,000 |
| May 25, 2016 | Expired or cancelled expired Sep 2019 | 112 Woodland Av | replace existing perimeter foundationDetails
replace existing perimeter foundation | $60,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2016 | 3161 Washington St | new three story elevator. limited use limited accessibility elevator.Details
new three story elevator. limited use limited accessibility elevator. | $35,000 |
| Apr 12, 2016 | Completed final sign-off Sep 2022 | 3490 20th St | this application for change of use from office, tomulti family dwelling ( 4 tenant space). via 2 unit on the second & third floor.Details
this application for change of use from office, tomulti family dwelling ( 4 tenant space). via 2 unit on the second & third floor. | $300,000 |
| Apr 1, 2016 | Expired or cancelled expired Sep 2019 | 112 Woodland Av | r/r all lath & plaster. replace with (n) 5/8in type x sheet rock throughout. no structural work under this permit. no relocation of any walls, windows & doors.Details
r/r all lath & plaster. replace with (n) 5/8in type x sheet rock throughout. no structural work under this permit. no relocation of any walls, windows & doors. | $100,000 |
| Mar 31, 2016 | Completed final sign-off Aug 2016 | 130 11th Av | replace aluminum windows and restore to original state (wood) windows are visible form the street. 4 windows total in kind u.<0.32Details
replace aluminum windows and restore to original state (wood) windows are visible form the street. 4 windows total in kind u.<0.32 | $3,000 |
| Mar 23, 2016 | Completed final sign-off Sep 2017 | 18 Prospect Av | voluntary structural strengthening. new stairs from sub-basement to 1st floor. remodel basement, 1st, 2nd & 3rd floor. new patio door & deck @ basement level. change basment layout and add 1.2 bath and 2 bedrooms.Details
voluntary structural strengthening. new stairs from sub-basement to 1st floor. remodel basement, 1st, 2nd & 3rd floor. new patio door & deck @ basement level. change basment layout and add 1.2 bath and 2 bedrooms. | $100,000 |
| Mar 7, 2016 | Completed final sign-off Sep 2016 | 130 11th Av | remodel kitchen at 2nd floor. split bathroom at 3rd floor. remove wall between dining room & kitchen @ 2nd floor. add storage room at 1st floor. replace (e) fireplace with (n) gas fire place.Details
remodel kitchen at 2nd floor. split bathroom at 3rd floor. remove wall between dining room & kitchen @ 2nd floor. add storage room at 1st floor. replace (e) fireplace with (n) gas fire place. | $30,000 |
| Jan 14, 2016 | Completed final sign-off Dec 2016 | 1151 Sanchez St | convert bedroom to bathroom at 2nd floor, remove interior partition walls, voluntary strengthening, change skylight configuration.Details
convert bedroom to bathroom at 2nd floor, remove interior partition walls, voluntary strengthening, change skylight configuration. | $65,000 |