Block 1761, lot 022
198 Judah St
- City’s use
- Single Family Residential
- Built
- 1911
- Stories
- 4
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 4,315 sq ft
- Lot
- 2,375 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Jun 2026 | 198 Judah St | addressing permit only: purpose of this permit is to retire the address 1392 7th ave from apn 1761/022. 198 judah st will be reinstated as the primary address for this property. ref pa #202310118402Details
addressing permit only: purpose of this permit is to retire the address 1392 7th ave from apn 1761/022. 198 judah st will be reinstated as the primary address for this property. ref pa #202310118402 | ||
| Feb 5, 2026 | In progress issued Mar 2026 | 1392 07th Av | Dotto Construction Co | revision to pa #2023-1011-8402: change of scope at garage. to remove 1 of 2 garage doors.Details
revision to pa #2023-1011-8402: change of scope at garage. to remove 1 of 2 garage doors. | |
| Nov 7, 2025 | In progress issued Sep 2026 | 1392 07th Av | Sun First Solar | solar permit: installing 12 solar pv modules, 425 watts per module, total no. of rating 5.1 kw. mounted: roof, ballasted: y | install (12) roof mounted pv solar modules, (2) tesla powerwall 3 (13.5kwh) with (1) expansion unit and (1) telsa gateway 3Details
solar permit: installing 12 solar pv modules, 425 watts per module, total no. of rating 5.1 kw. mounted: roof, ballasted: y | install (12) roof mounted pv solar modules, (2) tesla powerwall 3 (13.5kwh) with (1) expansion unit and (1) telsa gateway 3 | |
| Oct 11, 2023 | In progress issued Oct 2024 | 1392 07th Av | Dotto Construction Co | relocate primary entrance from 7th ave to judah st based on historic plans. remodel existing kitchen. install new deck in yard (below 36"). build new grill/prep area in existing garage.1a restore to original facade per historic arch plansDetails
relocate primary entrance from 7th ave to judah st based on historic plans. remodel existing kitchen. install new deck in yard (below 36"). build new grill/prep area in existing garage.1a restore to original facade per historic arch plans | $90,000 |
| Jan 8, 2021 | Completed final sign-off Jul 2021 | 1392 07th Av | Stokely Marcus Construction Inc | remodel (2) bathrooms on 2nd & 3rd fl; replace tub, toilet & vanity at (e) location. no change to wall & opening layoutDetails
remodel (2) bathrooms on 2nd & 3rd fl; replace tub, toilet & vanity at (e) location. no change to wall & opening layout | $28,000 |
| Nov 17, 2020 | Completed final sign-off Jul 2021 | 1392 07th Av | Stokely Marcus Construction Inc | convert storage to wine cellar at basement. convert full bathroom to 1/2 bath and g/f. relocate master bath & remodel (e) office on 3/f.Details
convert storage to wine cellar at basement. convert full bathroom to 1/2 bath and g/f. relocate master bath & remodel (e) office on 3/f. | $43,000 |
| Apr 23, 2014 | Never finaled issued Apr 2014, no final | 1392 07th Av | change adress from 198 judah st. to main entrance at 7th ave as: 1392 7th ave at block 1761, lot 022.Details
change adress from 198 judah st. to main entrance at 7th ave as: 1392 7th ave at block 1761, lot 022. | ||
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 198 Judah St | Cht Properties Development | remove partition wall on (e) ground fl. convert study room & bedroom to library & add closet @ 2nd fl. convert (e) workshop to (n) master bedrm, convert (e) library to (n) office, remove closet to (e) office & move door & convert (e) storage to (n) closet all on 3rd fl.Details
remove partition wall on (e) ground fl. convert study room & bedroom to library & add closet @ 2nd fl. convert (e) workshop to (n) master bedrm, convert (e) library to (n) office, remove closet to (e) office & move door & convert (e) storage to (n) closet all on 3rd fl. | $7,000 |
| May 21, 2008 | Completed final sign-off Sep 2008 | 198 Judah St | correct nov 200854374: remove non permitted roof dormer and construct back to original roof configuration. add 2 bathrooms on 2 main floors.Details
correct nov 200854374: remove non permitted roof dormer and construct back to original roof configuration. add 2 bathrooms on 2 main floors. | $50,000 | |
| Apr 18, 2008 | Completed final sign-off Sep 2008 | 198 Judah St | Cht Properties Development | repair water damage on ceiling and walls for 1st, 2nd and 3rd floors. paint exterior of the bldg.Details
repair water damage on ceiling and walls for 1st, 2nd and 3rd floors. paint exterior of the bldg. | $120,000 |
| Mar 28, 2008 | Completed final sign-off Sep 2008 | 198 Judah St | Cht Properties Development | remodel kitchen will use all fluorescent lights. remodel 3 bathrooms will use all fluorescent lights or use occupancy sensors.Details
remodel kitchen will use all fluorescent lights. remodel 3 bathrooms will use all fluorescent lights or use occupancy sensors. | $25,000 |
| Feb 15, 2007 | Completed final sign-off May 2007 | 198 Judah St | remove existing chimney to roof level and cap off.Details
remove existing chimney to roof level and cap off. | $1,400 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.