Back to kitchen remodel contractors
Stingray Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Sep 2026
- Last 24 months
- 4 permits filed
50 permits since 2000: 40 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 2 in progress. Typically 17 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Apr 2026 | 27 Homestead St | renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work).Details
renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work). | $25,000 |
| Apr 12, 2023 | In progress issued Feb 2024 | 74 Banks St | facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floorDetails
facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floor | $500,000 |
| Apr 6, 2021 | Completed final sign-off Jul 2022 | 8 Russian Hill Pl | unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898.Details
unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898. | $200,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2020 | 56 Nebraska St | kitchen remodel. replace (2) existing windows in kind. not visible from streetDetails
kitchen remodel. replace (2) existing windows in kind. not visible from street | $40,000 |
| Jun 30, 2016 | Completed final sign-off Nov 2017 | 1676 Sanchez St | 2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom.Details
2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom. | $175,000 |
| Oct 6, 2015 | Completed final sign-off Mar 2016 | 1275 Florida St | remodel extg kitchen.Details
remodel extg kitchen. | $40,000 |
| Mar 31, 2015 | Completed final sign-off May 2016 | 44 Lundys Ln | no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement.Details
no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement. | $90,000 |
| Apr 15, 2014 | Completed final sign-off Mar 2016 | 1177 De Haro St | horizontal addition deck to existing roof deck at 2nd level. interior remodel of the kitchen & dining room. no modification to street elevation.Details
horizontal addition deck to existing roof deck at 2nd level. interior remodel of the kitchen & dining room. no modification to street elevation. | $30,000 |
| Feb 14, 2014 | Completed final sign-off Apr 2015 | 1145 York St | renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck.Details
renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck. | $180,000 |
| Aug 15, 2013 | Completed final sign-off Jun 2014 | 237 Lexington St | remodel of extg interior including kitchen, den, living room, bedroom, and 1 bthroom. work to include demolition and new construction of partitions, new appliances, lighting, finishes and millwork, cabinetry. replace 6 windows in-kind. see structural drawing for scope of work.Details
remodel of extg interior including kitchen, den, living room, bedroom, and 1 bthroom. work to include demolition and new construction of partitions, new appliances, lighting, finishes and millwork, cabinetry. replace 6 windows in-kind. see structural drawing for scope of work. | $50,000 |
| Sep 17, 2012 | Completed final sign-off Sep 2012 | 283 28th Av | revision to app#201105236592 to remodel extg kitchen, new cabinets and counters and fixtures.Details
revision to app#201105236592 to remodel extg kitchen, new cabinets and counters and fixtures. | |
| Sep 1, 2010 | Completed final sign-off Dec 2010 | 969 De Haro St | revision to 201008058221: additional structural framing due to unforseen conditions. relace sills, floor joists, studs, ceiling joists in existing kitchen. increase height of 2 replacement windows by 9" and new accordian door by 1 1/2"Details
revision to 201008058221: additional structural framing due to unforseen conditions. relace sills, floor joists, studs, ceiling joists in existing kitchen. increase height of 2 replacement windows by 9" and new accordian door by 1 1/2" | $9,000 |
| Mar 4, 2010 | Completed final sign-off Jul 2010 | 2860 Greenwich St | repair (e) cabinets in living rm, modify closet in dining rm to be wine bar, raise passage opening kitchen to living rm & master bedrm from 6'-8" to 8' (non-bearing wall), repl furnace door w/blind door, remove closet in bedrm, repl bannister & balusters, update interior trim & repair plaster througDetails
repair (e) cabinets in living rm, modify closet in dining rm to be wine bar, raise passage opening kitchen to living rm & master bedrm from 6'-8" to 8' (non-bearing wall), repl furnace door w/blind door, remove closet in bedrm, repl bannister & balusters, update interior trim & repair plaster throug | $20,000 |
| Feb 12, 2010 | Completed final sign-off May 2010 | 4264 26th St | gut (e) kitchen counters, appliances, finish floor. demo non bearing wall. install new floor, cabinets, appliances, sink. relocate (e) electrical panel. all work on 2nd floorDetails
gut (e) kitchen counters, appliances, finish floor. demo non bearing wall. install new floor, cabinets, appliances, sink. relocate (e) electrical panel. all work on 2nd floor | $45,000 |