Stingray Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Sep 2026
- Last 24 months
- 4 permits filed
50 permits since 2000: 40 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 6 completed, 2 in progress. Typically 28 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Apr 2026 | 27 Homestead St | renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work).Details
renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work). | $25,000 |
| Apr 12, 2023 | In progress issued Feb 2024 | 74 Banks St | facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floorDetails
facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floor | $500,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2017 | 1808 Greenwich St | remove & replace (e) cement shingle siding w/ lap siding levels 1-3. (e) deck & fire escape to be removed for siding replacement & replace in-kind. not visible from street.Details
remove & replace (e) cement shingle siding w/ lap siding levels 1-3. (e) deck & fire escape to be removed for siding replacement & replace in-kind. not visible from street. | $15,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 44 Lundys Ln | revision to pa #201503312338 to repair less than 50% of deck at rear in kind - redo rotten deck boards.Details
revision to pa #201503312338 to repair less than 50% of deck at rear in kind - redo rotten deck boards. | $2,500 |
| Jun 20, 2014 | Completed final sign-off Jul 2015 | 1145 York St | remove e backstair and replace with new deck and stair structureDetails
remove e backstair and replace with new deck and stair structure | $10,000 |
| Feb 14, 2014 | Completed final sign-off Apr 2015 | 1145 York St | renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck.Details
renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck. | $180,000 |
| Aug 18, 2010 | Completed final sign-off Sep 2010 | 11 Mountview Ct | revision to pa# 2010.03.18.8522. eliminate gate and stairs to grade. extend lower deck 3' to share same posts that support new upper deck ( lower deck still to be smaller than existing original deck0)Details
revision to pa# 2010.03.18.8522. eliminate gate and stairs to grade. extend lower deck 3' to share same posts that support new upper deck ( lower deck still to be smaller than existing original deck0) | |
| Mar 18, 2010 | Completed final sign-off Sep 2010 | 11 Mountview Ct | build new 2nd floor deck 9' x 12'; replace (e) window w/new slider to new deck. rebuild deteriorated existing lower deck.Details
build new 2nd floor deck 9' x 12'; replace (e) window w/new slider to new deck. rebuild deteriorated existing lower deck. | $19,500 |