Back to bathroom remodel contractors
Stingray Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Sep 2026
- Last 24 months
- 4 permits filed
50 permits since 2000: 40 completed, 5 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 2 in progress. Typically 13 days from filing to permit and 311 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Apr 2026 | 27 Homestead St | renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work).Details
renovate 3rd floor bathroom. no change to walls / floor plan. repair dry rot damage at (e) deck & stair (less than 50%). remove drywall in laundry, kitchen & 1st floor, common space to explore water damage. patch drywall cut by electricians under separate permit. (unrelated to this scope of work). | $25,000 |
| Apr 12, 2023 | In progress issued Feb 2024 | 74 Banks St | facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floorDetails
facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floor | $500,000 |
| Feb 10, 2022 | Completed final sign-off Dec 2022 | 708 Castro St | rev pa202106233059 & 202006259150: relocate n washer/dryer to (n) closet. relocate (n) toilet w/in (n) bath & closets w/in (n) bedroom. replace (n) stairs to rear yard w/ (n) emergency escape/rescue ladder. (n) 2-burner range,mw,sinks,fridge,wetbar at (e) family room.Details
rev pa202106233059 & 202006259150: relocate n washer/dryer to (n) closet. relocate (n) toilet w/in (n) bath & closets w/in (n) bedroom. replace (n) stairs to rear yard w/ (n) emergency escape/rescue ladder. (n) 2-burner range,mw,sinks,fridge,wetbar at (e) family room. | |
| Apr 6, 2021 | Completed final sign-off Jul 2022 | 8 Russian Hill Pl | unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898.Details
unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898. | $200,000 |
| Jun 30, 2016 | Completed final sign-off Nov 2017 | 1676 Sanchez St | 2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom.Details
2 stories rear addition. some interior remodel. remove(e) chimney. 1/f: add (1) bedroom, remodel bathroom; 2/f: relocate (e) 2nd floor kitchen within the 2nd floor @ new addition; remodel (e) bathroom. | $175,000 |
| Apr 12, 2016 | Completed final sign-off Aug 2018 | 4264 26th St | interior remodel of the (e) family room, office and 3rd bathroom to a master suite. the area of remodel is limited to the 2nd flr at the rear of the structure. the work is not visible from the street.Details
interior remodel of the (e) family room, office and 3rd bathroom to a master suite. the area of remodel is limited to the 2nd flr at the rear of the structure. the work is not visible from the street. | $40,000 |
| Nov 25, 2015 | Completed final sign-off Apr 2016 | 44 Lundys Ln | upper unit - remodel of 3rd floor bathroom, in-kind remodel.Details
upper unit - remodel of 3rd floor bathroom, in-kind remodel. | $10,000 |
| Mar 31, 2015 | Completed final sign-off May 2016 | 44 Lundys Ln | no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement.Details
no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement. | $90,000 |
| Feb 14, 2014 | Completed final sign-off Apr 2015 | 1145 York St | renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck.Details
renovation, rehabilitation, remodeling of rear 1/3 of dwelling, 1/f: remodel & enlarge kitchen, relocate bedroom. 2/f: relocate 1 bathroom & add a 2nd bathroom, relocate rear bedroom. replace windows at rear, rehabilitate 2/f deck. | $180,000 |
| Jul 27, 2011 | Completed final sign-off Jan 2012 | 237 Lexington St | remodel to extg residence to add master bedroom, bath, and study. work includes demolition, adding partitions, plmg fixtures,structural bracing. add lights, replaceing window, addition of skylight, new finishes, tile work.Details
remodel to extg residence to add master bedroom, bath, and study. work includes demolition, adding partitions, plmg fixtures,structural bracing. add lights, replaceing window, addition of skylight, new finishes, tile work. | $50,000 |
| May 23, 2011 | Completed final sign-off Sep 2012 | 283 28th Av | add a horizontal extension at the second floor only at rear of house. this enlarges a bedroom and adds a new bathroom. additional remodeling of closets, etc. at second floor. add two skylights in existing flat roof.Details
add a horizontal extension at the second floor only at rear of house. this enlarges a bedroom and adds a new bathroom. additional remodeling of closets, etc. at second floor. add two skylights in existing flat roof. | $60,000 |
| Aug 7, 2008 | Completed final sign-off Nov 2008 | 1160 Mission St | #508- remodel existing unit to include closing existing door opening, opening for new doors, retile bathroom and add shower head.Details
#508- remodel existing unit to include closing existing door opening, opening for new doors, retile bathroom and add shower head. | $30,000 |