Back to kitchen remodel contractors
Stellar Construction
- Based in
- Fairfax
- On San Francisco permits
- Nov 2005 to Jul 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 28 completed, 1 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 2 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2011 | Expired or cancelled expired Jan 2013 | 1200 California St | #4b -remove closer from master bedroom hall, relocate master bedroom door, remove guest rom wing wall partition to form alcove, fur out master hall, add guest closet to allow for electrical upgrades, isntall 7 new light fixtures & one kitchen faucet.Details
#4b -remove closer from master bedroom hall, relocate master bedroom door, remove guest rom wing wall partition to form alcove, fur out master hall, add guest closet to allow for electrical upgrades, isntall 7 new light fixtures & one kitchen faucet. | $60,000 |
| Aug 1, 2011 | Expired or cancelled expired Nov 2013 | 338 Spear St | barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884Details
barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884 | |
| Jun 7, 2011 | Never finaled issued Jun 2011, no final | 338 Spear St | the infinity. unit 40b. condo upgrade incl. relocation of laundry, new pocket dr at library,new lighting and switching, new trim and casings, new valance at two perimiter walls, and new bfast counter at kitchen. relocate 4 furnace vents, and install 2 new exhaust fans.Details
the infinity. unit 40b. condo upgrade incl. relocation of laundry, new pocket dr at library,new lighting and switching, new trim and casings, new valance at two perimiter walls, and new bfast counter at kitchen. relocate 4 furnace vents, and install 2 new exhaust fans. | $148,000 |
| Apr 27, 2011 | Never finaled issued Apr 2011, no final | 338 Spear St | condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11Details
condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11 | $330,000 |
| Feb 17, 2009 | Completed final sign-off May 2009 | 283 Coleridge St | kitchen reomdel, new cabinets, all new appliances, new tile floor, counters. addition of lighting & receptacles, new stove venting, no structural changes. approx 6 new electrical circuits. min 50% of kitchen light watts must be from fluorescent lights.Details
kitchen reomdel, new cabinets, all new appliances, new tile floor, counters. addition of lighting & receptacles, new stove venting, no structural changes. approx 6 new electrical circuits. min 50% of kitchen light watts must be from fluorescent lights. | $52,000 |
| May 14, 2007 | Completed final sign-off Feb 2008 | 475 Lombard St | unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location.Details
unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location. | $175,000 |