41 permits since 2000: 28 completed, 1 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 7 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2025 | Completed final sign-off Aug 2025 | 2832 Lyon St | revision to permit 202503283293. changes to deck tiles, guardrail and posts.Details
revision to permit 202503283293. changes to deck tiles, guardrail and posts. | |
| Dec 5, 2019 | Completed final sign-off Dec 2020 | 1871 Bush St | extend deck to rear yard. no change to front facade or egress systems.Details
extend deck to rear yard. no change to front facade or egress systems. | $10,000 |
| Sep 4, 2019 | Completed final sign-off Oct 2019 | 221 Arguello Bl | less than 50% deck repair, remove approx. 160 sf redwood decking. replace with ipe decking. framing to remain, ground level deck.Details
less than 50% deck repair, remove approx. 160 sf redwood decking. replace with ipe decking. framing to remain, ground level deck. | $16,000 |
| Aug 29, 2017 | Completed final sign-off Nov 2017 | 3355 21st St | no change. repair/replace rotted wood on side deck/stairs, replace less than 50% of materials.Details
no change. repair/replace rotted wood on side deck/stairs, replace less than 50% of materials. | $8,000 |
| Oct 31, 2016 | Completed final sign-off Jan 2018 | 310 Cresta Vista Dr | add a second story deck at the rear side with spiral staircase. add a new lower deck at the rear side. add new concrete retaining wall with piersDetails
add a second story deck at the rear side with spiral staircase. add a new lower deck at the rear side. add new concrete retaining wall with piers | $50,000 |
| Dec 9, 2013 | Completed final sign-off Apr 2014 | 56 Winfield St | modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repairDetails
modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repair | $5,000 |
| Jun 6, 2013 | Expired or cancelled cancelled Jan 2026 | 358 Prospect Av | repair & replace existing upper decks (3 total). add new railing system. replace ground floor deck. add new ground floor terrace.Details
repair & replace existing upper decks (3 total). add new railing system. replace ground floor deck. add new ground floor terrace. | $116,000 |
| Jun 14, 2010 | Completed final sign-off Jul 2010 | 422 22nd Av | deck repairs-remove wood 2x6 from 2 decks & replace with trex composite decking. remove 2 rails & replace with 42" high rails, less than 50% of deck. decks at the back of the houseDetails
deck repairs-remove wood 2x6 from 2 decks & replace with trex composite decking. remove 2 rails & replace with 42" high rails, less than 50% of deck. decks at the back of the house | $18,000 |