Back to bathroom remodel contractors
Stellar Construction
- Based in
- Fairfax
- On San Francisco permits
- Nov 2005 to Jul 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 28 completed, 1 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 3 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2025 | In progress issued Jul 2025 | 3240 Sacramento St | apt a : bathroom remodel. no change in configuration. new shower valves, shower pan, fan, tiles and vanity. no wall removalDetails
apt a : bathroom remodel. no change in configuration. new shower valves, shower pan, fan, tiles and vanity. no wall removal | $18,000 |
| May 11, 2018 | Never finaled issued May 2018, no final | 85 Buena Vista Tr | bathroom remodel. remove/replace bath tub. install 2 new sinks (adding 1 sink to 2), new vanity, toilet, light fixture, tub drain and valve and tile, 1 new plug. no change i n walls & openings layoutDetails
bathroom remodel. remove/replace bath tub. install 2 new sinks (adding 1 sink to 2), new vanity, toilet, light fixture, tub drain and valve and tile, 1 new plug. no change i n walls & openings layout | $27,000 |
| Feb 24, 2015 | Completed final sign-off Aug 2015 | 625 09th Av | bathroom remodel: plumbing, electriical, tile, new fixture, new window, and pocket doors. no structural work as per plans.Details
bathroom remodel: plumbing, electriical, tile, new fixture, new window, and pocket doors. no structural work as per plans. | $15,000 |
| Aug 1, 2011 | Expired or cancelled expired Nov 2013 | 338 Spear St | barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884Details
barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884 | |
| Apr 27, 2011 | Never finaled issued Apr 2011, no final | 338 Spear St | condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11Details
condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11 | $330,000 |
| Aug 2, 2010 | Completed final sign-off Mar 2011 | 631 39th Av | master bedroom and bathroom remodel, new sheetrock, r-13 insulation, new shower pau and tile, new electrical plugs and lighting, new wall mounted toilet and sinks - 2. new tile shower and bathroom floor, new shower valve & faucets, vanities and counter tops.Details
master bedroom and bathroom remodel, new sheetrock, r-13 insulation, new shower pau and tile, new electrical plugs and lighting, new wall mounted toilet and sinks - 2. new tile shower and bathroom floor, new shower valve & faucets, vanities and counter tops. | $30,000 |
| May 14, 2007 | Completed final sign-off Feb 2008 | 475 Lombard St | unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location.Details
unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location. | $175,000 |
| Nov 4, 2005 | Expired or cancelled expired Aug 2006 | 1544 Church St | upgrade bathroom to meet ada (new toilet & sink) & new front door. (bathroom to be accessable)Details
upgrade bathroom to meet ada (new toilet & sink) & new front door. (bathroom to be accessable) | $10,000 |