Steelcore Builders Inc
- Based in
- Sausalito
- On San Francisco permits
- Aug 2015 to Sep 2025
- Last 24 months
- 3 permits filed
149 permits since 2000: 127 completed, 1 in progress, 20 never finaled, 1 expired or cancelled.
Of the 20 never-finaled permits, 7 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 61 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2021 | Completed final sign-off Apr 2025 | 1812 Webster St | remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouseDetails
remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouse | $350,000 |
| Mar 9, 2021 | Never finaled issued Oct 2021, no final | 1490 Willard St | interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard.Details
interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard. | $110,000 |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 170 Parnassus Av | repair (e) stairway support. add new cages to (e) storage areaDetails
repair (e) stairway support. add new cages to (e) storage area | $20,000 |
| Jul 20, 2018 | Completed final sign-off Sep 2018 | 236 Hugo St | revision to 201609087055 soft story retrofit, relocate front moment frame a few feet back, a few ft back revise tranverse grade beams add deepen see foundations, relocate some shear walls reinforce some foundations & joist & staircase.Details
revision to 201609087055 soft story retrofit, relocate front moment frame a few feet back, a few ft back revise tranverse grade beams add deepen see foundations, relocate some shear walls reinforce some foundations & joist & staircase. | |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 25 Guerrero St | in kind stair repair, less than 50% of dry rot at exterior stair located in the lightwell of the south side of building. not visable from street.Details
in kind stair repair, less than 50% of dry rot at exterior stair located in the lightwell of the south side of building. not visable from street. | $1,000 |