Block 3502, lot 037
25 Guerrero St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 3
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 4,845 sq ft
- Lot
- 2,000 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2022 | Completed final sign-off Jun 2022 | 25 Guerrero St | Standardconstr/Standardroof | reroofingDetails
reroofing | $23,000 |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 25 Guerrero St | Steelcore Builders Inc | in kind stair repair, less than 50% of dry rot at exterior stair located in the lightwell of the south side of building. not visable from street.Details
in kind stair repair, less than 50% of dry rot at exterior stair located in the lightwell of the south side of building. not visable from street. | $1,000 |
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 25 Guerrero St | street space permitDetails
street space permit | ||
| Aug 30, 2016 | Completed final sign-off Jan 2017 | 25 Guerrero St | Steelcore Builders Inc | replace h.c.t. boiler room wall and demo existing brick incinerator. share drawing with pa#201608296292Details
replace h.c.t. boiler room wall and demo existing brick incinerator. share drawing with pa#201608296292 | $11,606 |
| Aug 29, 2016 | Completed final sign-off Jan 2017 | 25 Guerrero St | Steelcore Builders Inc | soft story retrofit using iebc ch a4Details
soft story retrofit using iebc ch a4 | $91,606 |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 25 Guerrero St | A B C Window Contractors | install 4 vinly windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section. for rescues all windows will be double pane and have a u factorDetails
install 4 vinly windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section. for rescues all windows will be double pane and have a u factor | $1,700 |
| Sep 30, 2014 | Never finaled filed Sep 2014, never issued | 25 Guerrero St | apt #302: replace 3 windows, 2 in the kitchen, 1 in the bathroom, not visible from streetDetails
apt #302: replace 3 windows, 2 in the kitchen, 1 in the bathroom, not visible from street | $1,500 | |
| Dec 20, 2012 | Completed final sign-off Jul 2013 | 25 Guerrero St | Innovative Windows | remove existing wood double hungs and replace with new wood double hungs, like in kind, 6 windows total, 2 on fire escape to have safety glass.Details
remove existing wood double hungs and replace with new wood double hungs, like in kind, 6 windows total, 2 on fire escape to have safety glass. | $5,000 |
| Apr 30, 2007 | Completed final sign-off Jul 2007 | 25 Guerrero St | American Construction | unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen.Details
unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen. | $12,000 |
| Feb 9, 2007 | Completed final sign-off May 2007 | 25 Guerrero St | work @ unit# 201 only. remodel bathroom. add washer dryer hook up. remodel kitchen. new cabinets & flooring. no window or door work.Details
work @ unit# 201 only. remodel bathroom. add washer dryer hook up. remodel kitchen. new cabinets & flooring. no window or door work. | $20,000 | |
| Nov 10, 2006 | Completed final sign-off Mar 2007 | 25 Guerrero St | work @ unit# 202. remodel bathroom. remove shower. replace with corner shower & add washer dryer hookup. add vent for dryer. 100 sq. in. no structural work. remodel kithcen. new cabinets & flooring. no window or door work on this permit.Details
work @ unit# 202. remodel bathroom. remove shower. replace with corner shower & add washer dryer hookup. add vent for dryer. 100 sq. in. no structural work. remodel kithcen. new cabinets & flooring. no window or door work on this permit. | $15,000 | |
| Aug 9, 2006 | Never finaled issued Aug 2006, no final | 25 Guerrero St | street spaceDetails
street space | ||
| Mar 14, 2006 | Completed final sign-off Jun 2006 | 25 Guerrero St | bolting building to foundation per planDetails
bolting building to foundation per plan | $7,000 | |
| Jul 21, 2005 | Completed final sign-off Jun 2006 | 25 Guerrero St | nov#3 & 6 repair wooden stair @rear,repair sheetrock fire proofing exit pathway,repair fire proofingDetails
nov#3 & 6 repair wooden stair @rear,repair sheetrock fire proofing exit pathway,repair fire proofing | $2,500 | |
| Jul 10, 2002 | Completed final sign-off Oct 2002 | 25 Guerrero St | remodel kitchen: new cabinets & dishwasher installation/bathrm; install vanity & new sinkDetails
remodel kitchen: new cabinets & dishwasher installation/bathrm; install vanity & new sink | $15,000 | |
| Nov 19, 2001 | Completed final sign-off Apr 2002 | 25 Guerrero St | Alvarez Construction | comply w/n.o.v. #200122009Details
comply w/n.o.v. #200122009 | $40,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.