Back to kitchen remodel contractors
Steelcore Builders Inc
- Based in
- Sausalito
- On San Francisco permits
- Aug 2015 to Sep 2025
- Last 24 months
- 3 permits filed
149 permits since 2000: 127 completed, 1 in progress, 20 never finaled, 1 expired or cancelled.
Of the 20 never-finaled permits, 7 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 never finaled. Typically 1 days from filing to permit and 374 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2024 | Completed final sign-off Nov 2024 | 76 Webster St | replace kitchen and one bathroom cabinets, countertops, tiles, and appliances in kind. no stud wall removal.Details
replace kitchen and one bathroom cabinets, countertops, tiles, and appliances in kind. no stud wall removal. | $75,000 |
| Feb 7, 2023 | Completed final sign-off Jan 2025 | 1812 Webster St | exploritory demo of interior plaster & demolition of heating ducts lcaed with asbestos (asbestos to be removed by asbestos contractor). exploratory demo of flr in living rm & kitchen & the second flr bedroom, ceiling and some walls plaster at dining & living. patch and replace-in=kind after for allDetails
exploritory demo of interior plaster & demolition of heating ducts lcaed with asbestos (asbestos to be removed by asbestos contractor). exploratory demo of flr in living rm & kitchen & the second flr bedroom, ceiling and some walls plaster at dining & living. patch and replace-in=kind after for all | $2,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 807 Ashbury St | unit #1:remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living roomDetails
unit #1:remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living room | $30,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 807 Ashbury St | unit #4 and #5: remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living roomDetails
unit #4 and #5: remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living room | $49,000 |
| Feb 24, 2022 | Completed final sign-off Sep 2023 | 78 Webster St | replace kitchen and bathroom cabinets, fixtures, tiles, and appliances.. in kind for one unit (no wall stud removal)Details
replace kitchen and bathroom cabinets, fixtures, tiles, and appliances.. in kind for one unit (no wall stud removal) | $90,000 |
| Mar 25, 2021 | Completed final sign-off Apr 2025 | 1812 Webster St | remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouseDetails
remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouse | $350,000 |
| Jul 2, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | two bathrooms and one kitchen remodelDetails
two bathrooms and one kitchen remodel | $73,500 |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 1231 Grove St | revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maherDetails
revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maher | |
| May 3, 2017 | Completed final sign-off Dec 2019 | 3140 Octavia St | adu per sf ordinance 162-16. (n) kitchen & bathroom.Details
adu per sf ordinance 162-16. (n) kitchen & bathroom. | $150,000 |