Block 1202, lot 003
1231 Grove St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 14
- Rooms
- 14 bathrooms
- Building
- 12,180 sq ft
- Lot
- 6,398 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2023 | Completed final sign-off Jan 2024 | 1231 Grove St | Crime Watch Security Sys Llc | upgrade (e) fire alarm systemm to comply with sffc section 1103.7.6.1Details
upgrade (e) fire alarm systemm to comply with sffc section 1103.7.6.1 | $39,000 |
| Jun 22, 2021 | Completed final sign-off Jan 2022 | 1231 Grove St | Reliable Construction Inc | unit 1: remodel kitchen & bath in-kind, upgrade unit electrical, add 14 lights, maintain 1-hour separation between units @ area of new work. no change to layout of walls & openings.Details
unit 1: remodel kitchen & bath in-kind, upgrade unit electrical, add 14 lights, maintain 1-hour separation between units @ area of new work. no change to layout of walls & openings. | $43,000 |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 1231 Grove St | street spaceDetails
street space | ||
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 1231 Grove St | side walk repair only.Details
side walk repair only. | ||
| Jul 30, 2018 | Never finaled issued Jul 2018, no final | 1231 Grove St | street spaceDetails
street space | ||
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 1231 Grove St | Steelcore Builders Inc | street spaceDetails
street space | |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 1231 Grove St | Steelcore Builders Inc | revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maherDetails
revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maher | |
| Feb 7, 2018 | Completed final sign-off Aug 2018 | 1231 Grove St | Steelcore Builders Inc | add new concrete footing, new wood frame floor and new walls in the 1st floor. ref. #2016-0512-7294. n/a for maherDetails
add new concrete footing, new wood frame floor and new walls in the 1st floor. ref. #2016-0512-7294. n/a for maher | $25,000 |
| Feb 6, 2018 | Never finaled issued Feb 2018, no final | 1231 Grove St | streetspaceDetails
streetspace | ||
| Jan 26, 2018 | Completed final sign-off May 2018 | 1231 Grove St | Quality Painting Construction | remodel kitchen and bath, add laundry, replace window door with new sliding glass door, replace rear porch in kind, new subpanel, add 20 can lights.Details
remodel kitchen and bath, add laundry, replace window door with new sliding glass door, replace rear porch in kind, new subpanel, add 20 can lights. | $37,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2018 | 1231 Grove St | Steelcore Builders Inc | relocate new concrete footings. revision to 201611223390 maher naDetails
relocate new concrete footings. revision to 201611223390 maher na | $3,000 |
| Jan 2, 2018 | Completed final sign-off Sep 2018 | 1231 Grove St | 13-D Fire Systems | add 4 fire sprinklers to convert garage on 1st fllor to new residential unit. building has (e) fire sprinkler system on first floor ref: 201605127294Details
add 4 fire sprinklers to convert garage on 1st fllor to new residential unit. building has (e) fire sprinkler system on first floor ref: 201605127294 | $4,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 1231 Grove St | street spaceDetails
street space | ||
| Aug 29, 2017 | Never finaled issued Aug 2017, no final | 1231 Grove St | street spaceDetails
street space | ||
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 1231 Grove St | street space permitDetails
street space permit | ||
| Nov 22, 2016 | Completed final sign-off Aug 2018 | 1231 Grove St | Steelcore Builders Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $75,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 1231 Grove St | Quality Painting Construction | unit #8: remodel (1) kitchen and (1) bath in kind, add laundry in existing closet, add 17 recessed lights, upgrade elec, install subpanel maher not reqDetails
unit #8: remodel (1) kitchen and (1) bath in kind, add laundry in existing closet, add 17 recessed lights, upgrade elec, install subpanel maher not req | $21,000 |
| Aug 9, 2016 | Never finaled issued Aug 2016, no final | 1231 Grove St | street spaceDetails
street space | ||
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 1231 Grove St | Quality Painting Construction | unit 6 - remodel kitchen and bath in kind, add launry, add 17 recessed lights upgrade, electrical install subpanel. maher naDetails
unit 6 - remodel kitchen and bath in kind, add launry, add 17 recessed lights upgrade, electrical install subpanel. maher na | $21,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 1231 Grove St | Quality Painting Construction | unit 7 - remodel kitchen and bath in kind, add laundry, add 17 recessed lights upgrade electrical install subpanel. maher naDetails
unit 7 - remodel kitchen and bath in kind, add laundry, add 17 recessed lights upgrade electrical install subpanel. maher na | $21,000 |
| May 12, 2016 | Completed final sign-off Jan 2019 | 1231 Grove St | interior & exterior alterations: construct 1 studio unit on the 1st floor in an (e) garage: a new kitchen, bath & washer/dryer. remove garage door - repair and replace with windows.Details
interior & exterior alterations: construct 1 studio unit on the 1st floor in an (e) garage: a new kitchen, bath & washer/dryer. remove garage door - repair and replace with windows. | $90,000 | |
| Apr 16, 2015 | Completed final sign-off Jul 2015 | 1231 Grove St | Make Ready Maintenance Inc | unit #5. kitchen and bathroom remodel. no walls to be moved, no structural or windows.Details
unit #5. kitchen and bathroom remodel. no walls to be moved, no structural or windows. | $23,000 |
| Oct 1, 2014 | Never finaled issued Oct 2014, no final | 1231 Grove St | Make Ready Maintenance Inc | kitchen and bathroom remodel unit #4.Details
kitchen and bathroom remodel unit #4. | $22,000 |
| Feb 8, 2008 | Never finaled issued Feb 2008, no final | 1231 Grove St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Steelcore Builders Inc (5), Quality Painting Construction (4), Make Ready Maintenance Inc (2), 13-D Fire Systems, Crime Watch Security Sys Llc, Reliable Construction Inc
- Engineers
- Darren Wong (2), Darren Wong
- Designers
- John Hood
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.