Spectrum Development Co.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Dec 2025
- Last 24 months
- 7 permits filed
108 permits since 2000: 92 completed, 6 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 11 completed, 2 in progress. Typically 52 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 81 Rosewood Dr | exterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rdDetails
exterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rd | $550,000 |
| Jul 23, 2025 | In progress issued Mar 2026 | 135 Melrose Av | b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bathDetails
b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bath | $250,000 |
| Nov 4, 2024 | Completed final sign-off Dec 2024 | 15 Schwerin St | demo and replacement in kind of exterior staircase visible from the street.Details
demo and replacement in kind of exterior staircase visible from the street. | $15,000 |
| Sep 27, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yardDetails
basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yard | $30,000 |
| Oct 2, 2020 | Completed final sign-off Apr 2021 | 679 Athens St | new openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom.Details
new openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom. | $89,500 |
| May 28, 2020 | Completed final sign-off Mar 2021 | 679 Athens St | dryrot repair at front stair framing. replacement in kind.Details
dryrot repair at front stair framing. replacement in kind. | $10,000 |
| Feb 16, 2018 | Completed final sign-off Mar 2019 | 139 Skyview Wy | renovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding.Details
renovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding. | $150,000 |
| Jan 10, 2017 | Completed final sign-off Apr 2019 | 229 Coleridge St | 80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit.Details
80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit. | $65,000 |
| Oct 6, 2016 | Completed final sign-off Aug 2018 | 109 Quintara St | new 400 sq ft roof deck & exterior wood stair on the south elevation.Details
new 400 sq ft roof deck & exterior wood stair on the south elevation. | $25,000 |
| Dec 16, 2014 | Completed final sign-off Jan 2019 | 271 Waller St | convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage.Details
convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage. | $50,000 |
| Jun 13, 2014 | Completed final sign-off Jul 2015 | 1783 San Jose Av | convert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet.Details
convert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet. | $65,000 |
| Jun 14, 2011 | Completed final sign-off Nov 2011 | 234 Connecticut St | kitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath.Details
kitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath. | $78,000 |
| Feb 28, 2011 | Completed final sign-off May 2011 | 159 Delmar St | front entrance stair repair/in-kind replacement per paln.Details
front entrance stair repair/in-kind replacement per paln. | $7,500 |