Permit GraphShortlistSan Francisco building permits since 2000

Spectrum Development Co.

Contractor license
707300
State license record
Based in
San Francisco
On San Francisco permits
Jul 2000 to Dec 2025
Last 24 months
7 permits filed

108 permits since 2000: 92 completed, 6 in progress, 6 never finaled, 4 expired or cancelled.

Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 2Deck 7Stairs 13Kitchen remodel 36Bathroom remodel 48

13 stairs permits: 11 completed, 2 in progress. Typically 52 days from filing to permit and 168 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 10, 2025In progress
filed Dec 2025, not yet issued
81 Rosewood Drexterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rd
Details
Permit
202512101476
Status
filed
Filed
Dec 10, 2025
Declared cost
$550,000
Address
81 Rosewood Dr

exterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rd

Open the permit page

$550,000
Jul 23, 2025In progress
issued Mar 2026
135 Melrose Avb/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bath
Details
Permit
202504235022
Status
issued
Filed
Jul 23, 2025
Permit issued
Mar 3, 2026
Declared cost
$250,000
Address
135 Melrose Av

b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bath

Open the permit page

$250,000
Nov 4, 2024Completed
final sign-off Dec 2024
15 Schwerin Stdemo and replacement in kind of exterior staircase visible from the street.
Details
Permit
202411044330
Status
complete
Filed
Nov 4, 2024
Permit issued
Nov 4, 2024
Final sign-off
Dec 18, 2024
Declared cost
$15,000
Address
15 Schwerin St

demo and replacement in kind of exterior staircase visible from the street.

Open the permit page

$15,000
Sep 27, 2024Completed
final sign-off Mar 2025
123 Melrose Avbasement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yard
Details
Permit
202409271866
Status
complete
Filed
Sep 27, 2024
Permit issued
Oct 2, 2024
Final sign-off
Mar 19, 2025
Declared cost
$30,000
Address
123 Melrose Av

basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yard

Open the permit page

$30,000
Oct 2, 2020Completed
final sign-off Apr 2021
679 Athens Stnew openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom.
Details
Permit
202010025797
Status
complete
Filed
Oct 2, 2020
Permit issued
Nov 30, 2020
Final sign-off
Apr 14, 2021
Declared cost
$89,500
Address
679 Athens St

new openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom.

Open the permit page

$89,500
May 28, 2020Completed
final sign-off Mar 2021
679 Athens Stdryrot repair at front stair framing. replacement in kind.
Details
Permit
202005287931
Status
complete
Filed
May 28, 2020
Permit issued
Jun 1, 2020
Final sign-off
Mar 17, 2021
Declared cost
$10,000
Address
679 Athens St

dryrot repair at front stair framing. replacement in kind.

Open the permit page

$10,000
Feb 16, 2018Completed
final sign-off Mar 2019
139 Skyview Wyrenovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding.
Details
Permit
201802161532
Status
complete
Filed
Feb 16, 2018
Permit issued
Feb 27, 2018
Final sign-off
Mar 27, 2019
Declared cost
$150,000
Address
139 Skyview Wy

renovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding.

Open the permit page

$150,000
Jan 10, 2017Completed
final sign-off Apr 2019
229 Coleridge St80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit.
Details
Permit
201701106843
Status
complete
Filed
Jan 10, 2017
Permit issued
Nov 30, 2017
Final sign-off
Apr 11, 2019
Declared cost
$65,000
Address
229 Coleridge St

80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit.

Open the permit page

$65,000
Oct 6, 2016Completed
final sign-off Aug 2018
109 Quintara Stnew 400 sq ft roof deck & exterior wood stair on the south elevation.
Details
Permit
201610069691
Status
complete
Filed
Oct 6, 2016
Permit issued
Mar 30, 2017
Final sign-off
Aug 13, 2018
Declared cost
$25,000
Address
109 Quintara St

new 400 sq ft roof deck & exterior wood stair on the south elevation.

Open the permit page

$25,000
Dec 16, 2014Completed
final sign-off Jan 2019
271 Waller Stconvert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage.
Details
Permit
201412163804
Status
complete
Filed
Dec 16, 2014
Permit issued
Nov 12, 2015
Final sign-off
Jan 22, 2019
Declared cost
$50,000
Address
271 Waller St

convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage.

Open the permit page

$50,000
Jun 13, 2014Completed
final sign-off Jul 2015
1783 San Jose Avconvert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet.
Details
Permit
201406138364
Status
complete
Filed
Jun 13, 2014
Permit issued
Mar 16, 2015
Final sign-off
Jul 30, 2015
Declared cost
$65,000
Address
1783 San Jose Av

convert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet.

Open the permit page

$65,000
Jun 14, 2011Completed
final sign-off Nov 2011
234 Connecticut Stkitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath.
Details
Permit
201106148013
Status
complete
Filed
Jun 14, 2011
Permit issued
Jul 28, 2011
Final sign-off
Nov 30, 2011
Declared cost
$78,000
Address
234 Connecticut St

kitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath.

Open the permit page

$78,000
Feb 28, 2011Completed
final sign-off May 2011
159 Delmar Stfront entrance stair repair/in-kind replacement per paln.
Details
Permit
201102281060
Status
complete
Filed
Feb 28, 2011
Permit issued
Mar 17, 2011
Final sign-off
May 31, 2011
Declared cost
$7,500
Address
159 Delmar St

front entrance stair repair/in-kind replacement per paln.

Open the permit page

$7,500