Southgate Home Design Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 1 permit filed
53 permits since 2000: 36 completed, 1 in progress, 14 never finaled, 2 expired or cancelled.
Of the 14 never-finaled permits, 3 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 9 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2018 | Completed final sign-off Jun 2019 | 2373 14th Av | interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yardDetails
interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yard | $100,000 |
| Aug 11, 2015 | Completed final sign-off Jan 2016 | 2935 20th Av | to comply with complaint 2008 71973 dated 9/5/2008: at rear yard, construct one-level new wood deck with stair 9'-6" above finished grade.Details
to comply with complaint 2008 71973 dated 9/5/2008: at rear yard, construct one-level new wood deck with stair 9'-6" above finished grade. | $9,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 29 Oliver St | 1)to comply with nov #200703464 to repair leaking.2)remodel extg bath on 2nd floor. 3)remodel extg bedrooms and extg bath on ground floor to comply with nov #201032221 & 201033049.4)install new interior stair & repair extg rear stair. 5) replace extg water heater and extg furnace.Details
1)to comply with nov #200703464 to repair leaking.2)remodel extg bath on 2nd floor. 3)remodel extg bedrooms and extg bath on ground floor to comply with nov #201032221 & 201033049.4)install new interior stair & repair extg rear stair. 5) replace extg water heater and extg furnace. | $45,000 |