Back to kitchen remodel contractors
Southgate Home Design Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 1 permit filed
53 permits since 2000: 36 completed, 1 in progress, 14 never finaled, 2 expired or cancelled.
Of the 14 never-finaled permits, 3 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 1 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 427 Moraga St | change kitchen cabinet & top flooring sink, range hood. change toilet & flooring sink.Details
change kitchen cabinet & top flooring sink, range hood. change toilet & flooring sink. | $7,500 |
| Mar 28, 2019 | Never finaled issued Apr 2019, no final | 1306 Thomas Av | 1st flr - add 1 bedroom, fam room and 1 full bath. 2nd flr - remodel kitchen and bath, add 1 half bath. infill east lightwell.Details
1st flr - add 1 bedroom, fam room and 1 full bath. 2nd flr - remodel kitchen and bath, add 1 half bath. infill east lightwell. | $70,000 |
| Oct 29, 2018 | Completed final sign-off Jun 2019 | 2373 14th Av | interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yardDetails
interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yard | $100,000 |
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 2474 36th Av | remodel kitchen and bath. remove shed at rear.Details
remodel kitchen and bath. remove shed at rear. | $25,000 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 187 Foote Av | remove extg kitchen, remove partial interior wall and upgrade partial ceiling joists. all work at 2nd floor.Details
remove extg kitchen, remove partial interior wall and upgrade partial ceiling joists. all work at 2nd floor. | $20,000 |
| May 19, 2017 | Completed final sign-off Apr 2018 | 124 Bacon St | 2nd fl: remodel (e) bath & (e) kitchen, add one (n) bath. ground fl: add two bedrooms, two bathrooms, & one storage. replace water heater & furnace. construct (n) bearing wall with footing instead of central beam.Details
2nd fl: remodel (e) bath & (e) kitchen, add one (n) bath. ground fl: add two bedrooms, two bathrooms, & one storage. replace water heater & furnace. construct (n) bearing wall with footing instead of central beam. | $65,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2015 | 3010 23rd Av | interior remodel and no exterior work. 1st floor : add 2 new bedrooms, one media room, two full bathrooms, new laundry and relocation of h/w and furnace. 2nd floor - remodel (e) kitchen, divide (e) bath into 2 new bathrooms, add one half bath and add closet. 3rd floor - remodel bath and add closet.Details
interior remodel and no exterior work. 1st floor : add 2 new bedrooms, one media room, two full bathrooms, new laundry and relocation of h/w and furnace. 2nd floor - remodel (e) kitchen, divide (e) bath into 2 new bathrooms, add one half bath and add closet. 3rd floor - remodel bath and add closet. | $20,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 66 Rossi Av | remodel extg kitchen and bathroom, add new bath on 2nd floor, legalize extg bath room and convert extg storages to bedroom and den on ground floor.Details
remodel extg kitchen and bathroom, add new bath on 2nd floor, legalize extg bath room and convert extg storages to bedroom and den on ground floor. | $45,000 |
| Apr 17, 2014 | Completed final sign-off Aug 2014 | 65 Burnett Av | replace cabinets, counter tops, sink, and tile flooring for existing kitchen on second floor.Details
replace cabinets, counter tops, sink, and tile flooring for existing kitchen on second floor. | $12,000 |
| May 16, 2011 | Completed final sign-off Sep 2015 | 6244 03rd St | remodel (e) unit at rear building. remodel (e) kitchen, add a furnace & electrical outletsDetails
remodel (e) unit at rear building. remodel (e) kitchen, add a furnace & electrical outlets | $9,000 |
| Sep 21, 2009 | Completed final sign-off Feb 2010 | 2929 26th Av | add 1 bedroom, 1 full bath, 1 storage rm on ground floor. remodel e bath and social room on gr fl. replace e furnace and windows (15 windows), remodel e kitchen, e bath, 1 new half bath 2nd flDetails
add 1 bedroom, 1 full bath, 1 storage rm on ground floor. remodel e bath and social room on gr fl. replace e furnace and windows (15 windows), remodel e kitchen, e bath, 1 new half bath 2nd fl | $35,000 |