Back to bathroom remodel contractors
Southgate Home Design Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2026
- Last 24 months
- 1 permit filed
53 permits since 2000: 36 completed, 1 in progress, 14 never finaled, 2 expired or cancelled.
Of the 14 never-finaled permits, 3 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 1 in progress, 2 never finaled. Typically 1 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | In progress issued May 2026 | 326 22nd Av | in-kind bathroom remodel, keep tub. removing and replacing (e) tiles for the bathroom, replacing toilet with new, replacing (e) sink and cabinet, the bathtub remains the same, kept as is. approx. 40 sq ft.Details
in-kind bathroom remodel, keep tub. removing and replacing (e) tiles for the bathroom, replacing toilet with new, replacing (e) sink and cabinet, the bathtub remains the same, kept as is. approx. 40 sq ft. | $18,000 |
| Mar 28, 2019 | Never finaled issued Apr 2019, no final | 1306 Thomas Av | 1st flr - add 1 bedroom, fam room and 1 full bath. 2nd flr - remodel kitchen and bath, add 1 half bath. infill east lightwell.Details
1st flr - add 1 bedroom, fam room and 1 full bath. 2nd flr - remodel kitchen and bath, add 1 half bath. infill east lightwell. | $70,000 |
| Oct 29, 2018 | Completed final sign-off Jun 2019 | 2373 14th Av | interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yardDetails
interior renovation. combine kitchen & breakfast nook, rebuild stair, renovate stair, renovate 1 (e) bathroom and add 1 bathroom upstairs. add nedroom, bathroom, media room and laundry downstairs. add deck in rear yard | $100,000 |
| Apr 25, 2018 | Completed final sign-off Aug 2018 | 2474 36th Av | 1st floor: add family room, full bath, and laundry.Details
1st floor: add family room, full bath, and laundry. | $30,000 |
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 2474 36th Av | remodel kitchen and bath. remove shed at rear.Details
remodel kitchen and bath. remove shed at rear. | $25,000 |
| Sep 7, 2017 | Completed final sign-off Nov 2017 | 2471 37th Av | bathroom remodel. new lighting outlet, fan, shower, toilet, sink. no changes to wall locations.Details
bathroom remodel. new lighting outlet, fan, shower, toilet, sink. no changes to wall locations. | $4,000 |
| May 19, 2017 | Completed final sign-off Apr 2018 | 124 Bacon St | 2nd fl: remodel (e) bath & (e) kitchen, add one (n) bath. ground fl: add two bedrooms, two bathrooms, & one storage. replace water heater & furnace. construct (n) bearing wall with footing instead of central beam.Details
2nd fl: remodel (e) bath & (e) kitchen, add one (n) bath. ground fl: add two bedrooms, two bathrooms, & one storage. replace water heater & furnace. construct (n) bearing wall with footing instead of central beam. | $65,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2017 | 520 Randolph St | comply with complaint #201543691, convert commercial space to additional residential unit & remodel existing bathroom. all work at ground floor.Details
comply with complaint #201543691, convert commercial space to additional residential unit & remodel existing bathroom. all work at ground floor. | $12,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2015 | 3010 23rd Av | interior remodel and no exterior work. 1st floor : add 2 new bedrooms, one media room, two full bathrooms, new laundry and relocation of h/w and furnace. 2nd floor - remodel (e) kitchen, divide (e) bath into 2 new bathrooms, add one half bath and add closet. 3rd floor - remodel bath and add closet.Details
interior remodel and no exterior work. 1st floor : add 2 new bedrooms, one media room, two full bathrooms, new laundry and relocation of h/w and furnace. 2nd floor - remodel (e) kitchen, divide (e) bath into 2 new bathrooms, add one half bath and add closet. 3rd floor - remodel bath and add closet. | $20,000 |
| Jul 28, 2014 | Completed final sign-off Oct 2014 | 7730 Geary Bl | construct one new bedroom, new bath, new storage, & new family room on ground floor.Details
construct one new bedroom, new bath, new storage, & new family room on ground floor. | $38,000 |
| Jul 8, 2014 | Completed final sign-off Oct 2014 | 66 Rossi Av | remodel 9e) bathroom on penthouse floor. replace/repair less than 50% dry rot in 30" height rear deck to comply w/ complaint #201482411Details
remodel 9e) bathroom on penthouse floor. replace/repair less than 50% dry rot in 30" height rear deck to comply w/ complaint #201482411 | $8,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 66 Rossi Av | remodel extg kitchen and bathroom, add new bath on 2nd floor, legalize extg bath room and convert extg storages to bedroom and den on ground floor.Details
remodel extg kitchen and bathroom, add new bath on 2nd floor, legalize extg bath room and convert extg storages to bedroom and den on ground floor. | $45,000 |
| Feb 26, 2013 | Completed final sign-off May 2013 | 2774 38th Av | 1st floor alteration to legalize bedroom & family room, convert half bathroom to full bath, add office & hallway.Details
1st floor alteration to legalize bedroom & family room, convert half bathroom to full bath, add office & hallway. | $30,000 |
| Jul 6, 2012 | Completed final sign-off Aug 2012 | 136 Talbert St | remodel extg bedroom, extg den, add one new bathroom and one new bedroom on ground floor.Details
remodel extg bedroom, extg den, add one new bathroom and one new bedroom on ground floor. | $35,000 |
| Dec 2, 2011 | Completed final sign-off Feb 2012 | 161 Thrift St | construct one new bedroom, one bathroom, one family room o ground floor. construct one new deck at rear yard.Details
construct one new bedroom, one bathroom, one family room o ground floor. construct one new deck at rear yard. | $30,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 29 Oliver St | 1)to comply with nov #200703464 to repair leaking.2)remodel extg bath on 2nd floor. 3)remodel extg bedrooms and extg bath on ground floor to comply with nov #201032221 & 201033049.4)install new interior stair & repair extg rear stair. 5) replace extg water heater and extg furnace.Details
1)to comply with nov #200703464 to repair leaking.2)remodel extg bath on 2nd floor. 3)remodel extg bedrooms and extg bath on ground floor to comply with nov #201032221 & 201033049.4)install new interior stair & repair extg rear stair. 5) replace extg water heater and extg furnace. | $45,000 |
| Oct 29, 2010 | Never finaled issued Jan 2011, no final | 178 Portola Dr | relocate laundry appliances for (n) media room, to include small bath - 314 sf coversion of (e) garage.Details
relocate laundry appliances for (n) media room, to include small bath - 314 sf coversion of (e) garage. | $39,903 |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 2574 16th Av | construct 2 new bedrooms, 1 laundry, 1 bath on gr fl. new deck at rear yard, replace e water heater and furnaceDetails
construct 2 new bedrooms, 1 laundry, 1 bath on gr fl. new deck at rear yard, replace e water heater and furnace | $40,000 |
| Sep 21, 2009 | Completed final sign-off Feb 2010 | 2929 26th Av | add 1 bedroom, 1 full bath, 1 storage rm on ground floor. remodel e bath and social room on gr fl. replace e furnace and windows (15 windows), remodel e kitchen, e bath, 1 new half bath 2nd flDetails
add 1 bedroom, 1 full bath, 1 storage rm on ground floor. remodel e bath and social room on gr fl. replace e furnace and windows (15 windows), remodel e kitchen, e bath, 1 new half bath 2nd fl | $35,000 |